1、防爆墙施工方案防爆墙施工方案BlastBlast WallWall ConstructionConstruction ProposalProposal防爆墙体基础为条形基础防爆墙体基础为条形基础,-0.2-0.2 以下到条形基础表面是以下到条形基础表面是 800800 厚的剪力墙厚的剪力墙。其施工方案如下其施工方案如下。TheThe foundationfoundation ofof blastblast wallwall isis stripstrip foundation,foundation, andand belowbelow -0.2-0.2 toto thethe stripstr
2、ipfoundationfoundation surfacesurface isis 800800 thickthick shearshear wall.Constructionwall.Construction ProposalProposal asas follows:follows:一、施工准备 Construction preparation(一)作业条件 Construction condition1、已办完模板及施工缝的预检手续。Completing the procedure offormwork andconstruction joints prechecking2、检查模板下
3、口、洞口及角模处拼接,大面模板拼接处是否严密,加固是否可靠,各种连接件及支撑是否牢固。Check the formwork end openings , entrances and joining together places, whetherthe joining together places of big formworks are tight and stably fastened, andwhether the fittings and supports are solid.3、墙体钢筋应有可靠的定位与混凝土保护层措施。Wall rebar should be reliablepositioning and the protective layer of concrete .4、施工缝处提前湿润。The construction joints should be humid i