1、 最最大大销销量量报报告告(例例表表) 分类:23 顺序 号商品编码状态商商品品名名称称进进价价售售价价 毛毛利利率率 % % 上上周周销销 售售额额 前前四四周周总总 销销售售额额 四四周周 销销售售 占占比比 四四周周销销 售售累累计计 占占比比 年年初初至至 今今 总总售售额额 平平均均 周周 销销售售 数数量量 现现有有 库库存存 数数 可可供供 销销 售售周周 数数 已已订订数数 量量 1164245A果冻爽礼包9*150g11.44136.514,06662,23117.07%17.07%26596311979510.802670 2029762A缤纷乐朱古力6*40g21.665
2、624.621.97,87832,0318.79%25.86%184,000325880.30900 3013617A四洲紫菜1*80g21.287224.194.88,44227,3357.50%33.36%166452833431.20640 4223306A恒兴小胡桃227g21.665624.626.54,99826,1717.18%40.54%2557482662731.00468 5271499A20PCS绿箭口香糖15.945618.120.66,05226,0387.14%47.68%2368873597182.00300 6192378A休闲凉果400g9.627210.94
3、4.59,61624,4146.70%54.38%1964605589891.801050 7175144A柳川海苔100g16.54418.80.01,80523,6506.49%60.87%1116943159823.100 8342341A艾可提香甜玉米花12.636814.3642.11,68022,8906.28%67.15%24940399512012.800 9294777A乳酸一级棒13.393615.227.92,84622,6786.22%73.37%8868137315574.200 10090667A费列罗巧克力T3*1669.951279.494.63,81619,7935.43%78.80%14141062580.90162 11342369A艾可提黄油玉米花12.636814.3642.153117,2184.72%83.52%14457300540118.0