个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
ImageVerifierCode 换一换

2020年南京融创豪宅项目整案营销沟通.pptx

  • 资源ID:147991       资源大小:39.49MB        全文页数:201页
  • 资源格式:  PPTX         下载积分: VIP专享
下载报告请您先登录!


友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

2020年南京融创豪宅项目整案营销沟通.pptx

1、 Nils: 全球著名的创意人 Nils is the most celebrated creative in the Asia region.Most recently he was Asia Pacific Creative President of TBWA, where he was awarded Asia Pacific Creative of the Year for the last 2 years in succession, at the Campaign agency of the year awards.TBWA became the most awarded agen

2、cy in the Asia region at Cannes 2017. Based in China, his China office was 2017 China One Show agency of the year, and also the New York Art Directors Club agency of the year too. All this based on stand out work for brands such as Adidas, Momo, Michelin, McDonalds and Penguin. And his Japan office

3、was agency of the year in Japan at the Campaign agency of the year awards 2017. Prior to TBWA, Nils took Y&R to great heights by winning China Agency of the year in 2015, with the most awarded print campaign in the world in the same year. Whilst at Y&R he and his team launched the GAP brand into the China market, building an entire ecommerce infrastructure for the brand too. He also launched the g


注意事项

本文(2020年南京融创豪宅项目整案营销沟通.pptx)为本站会员(儒***)主动上传,地产文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知地产文库(点击联系客服),我们立即给予删除!