1、while she was having a picnic at the edge of a forest with her children and tried to steal her handbag. In the struggle, the strap broke and, with the bag in their possession, both men started running through the trees. Mrs Sterling got so angry that she ran after them. She was soon out of breath, b
2、ut she continued to run. When she caught up with them, she saw that they had sat down and were going through the contents of the bag, so she ran straight at them. The men got such a fright that they dropped the bag and ran away. The strap needs mending, said Mrs Sterling later, but they did not stea
3、l anything. Lesson45 A clear conscience 问心无愧问心无愧 The whole village soon learnt that a large sum of money had been lost. Sam Benton, the local butcher, had lost his wallet while taking his savings to the post-office. Sam was sure that the wallet must have been found by one of the villagers, but it was not returned to him. Three months passed, and then one morning, Sam found his wallet outside his f