城市园林绿地滴水灌溉系统规划(英文)(18页).pptx
-
资源ID:130485
资源大小:1.83MB
全文页数:18页
-
资源格式:
PPTX
下载积分:
25金币
下载报告请您先登录!
验证码下载
账号登录下载
微信登录下载
|
友情提示
2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。
|
城市园林绿地滴水灌溉系统规划(英文)(18页).pptx
1、Drip Irrigation Best to find out what the water pressure is in your building. Fit a pressure gauge to the isolation valve. Pressure should be about 60 to 75 psi Backflow Preventer Prevents dirt, salmonella, etc from being sucked back into drinking water system. Important Always use backflow prevente
2、r on every drip system Pressure Regulators and Pressure Reducing Valves You will need to install a pressure regulator on your drip system if your water pressure is higher than 2,8 bars (40 PSI). Types of filters Screen Filter Most Common Cheap Excellent for removing hard particulates from water, suc
3、h as sand Media Filter Best for removing organic material from the water Centrifugal Filters Also known as sand separators, centrifugal filters are primarily for removing particulates, such as sand, from the water Disk Filters Disk filters are a cross between a screen filter and a media filter, with many of the advantages of both. Disk filters are good at removing both particulates, like sand, and