1、地块导则 PARCEL GUIDELINES 0617 DRAFT 导则 INTRODUCTION 导则对象 Audience 本设计导则是对总体规划的补充。 本导则的对象包括: 规划师; 建筑师; 景观建筑师; 工程师; 开发商; 其他参与CBD项目设计, 实施, 管理的个体。 所有对象应结合总体规划贯彻执行本设计导则, 力求达到本文规定的标准, 协调 各开发项目的建设, 使济南核心商务区成为一个充满活力的21世纪CBD范本。 These Design Guidelines are intended to be used in conjunction with the Jinan Centr
2、al Business District Urban Design Plan (the Master Plan report). The audience of this report includes: Planners; Architects; Landscape architects; Engineers; Developers; Other entities involved in the design, implementation, administration of projects within the CBD. Together with the Master Plan re
3、port, these Design Guidelines shall be used by the audiences listed above. The design requirements identified within this report should be followed by each design team with the intention of achieving the specified criteria and coordinating independent development projects. 导则执行方法 Guidelines Enforcement 本导则将由济南规划局负责执行及实施。 济南市规划局可指定代表确保和推进 导则的实施和执行。 济南市规划局应监督该规划导则的执行。 规划局应确保所有CBD项目的参与方 均能获得此导则报告。 该导