1、钢钢筋筋汇汇总总表表(分分类类) 工程名称:热水制备站 序号构件名称桩头插筋10内1级钢10内2级钢25内2级钢25内3级钢10内1级箍10内2级箍10外2级箍 小计 1承台、底板、剪力墙39354.106541.749 39895.855 2地梁10958.1262949.593 13907.719 3基础内柱筋3058.967329.802 3388.768 4负一层柱2867.02353.436 2920.459 5一层柱16200.4515967.751 22168.202 6二层柱7406.3932944.556 10350.949 7首层梁83732.53314582.485 98
2、315.018 8二层梁85022.79714716.257 99739.054 9屋面梁26766.1694954.477 31720.645 10首层板21023.72417064.515 38088.240 11二层板 1864.52623981.29825845.824 12屋面板 908.20110202.76611110.967 13楼梯 1616.425768.1172384.542 14其他构件(外墙节点等) 33411.7969173.37942585.175 合计0.0000.0000.000334191.2370.000108230.1800.0000.000442421
3、.417 0.0000.000334.1910.000108.2300.000 地下室(含顶板)159315.937800.000199.145 地上部分(159315.937)2200.000(72.416) 钢钢筋筋汇汇总总表表( (按按直直径径) ) 工程名称:热水制备站 序号部位/构件名称6(1级)8(1级)10(2级)12(2级)14(2级)16(3级)18(3级)20(3级)22(3级)25(3级)28(3级)小计(kg) 1承台、底板、剪力墙541.74926438.9061273.44017.95811623.80139895.855 4地梁216.3041007.7541725.5342579.840257.0538121.23413907.719 5基础内柱筋65.312264.489203.6162855.3513388.768 6负一层柱53.436542.9752