1、工料机表 工程名称:G区桩基工程第 页1 序号名称规格单位市场价数量合价百分比 1 混凝土工工日78.0009,129.18712,076.1221.80 2 钢筋工工日82.000368.2130,192.930.92 3 电焊工工日88.000703.6661,922.521.90 4 其他工工日78.0006,665.18519,884.0115.91 5 打桩工工日78.00016,903.661,318,485.2 9 40.36 * 6 起重工工日84.0007,396.98621,346.4419.02 * 7 制浆工工日78.00036.802,870.400.09 * 8 钢
2、丝绳 637 绳径34.5kg6.00017.20103.21* 9 钢桩帽kg5.5102,578.9914,210.220.03 * 10 送桩器kg6.2009,732.9160,344.040.12 * 11 护套管kg4.700173.00813.10* 12 钢丝绳 67 绳径24.5kg5.6491.096.17* 13 方木板只60.0001,765.70105,942.000.21 * 14 圆木墩只30.000202.256,067.420.01 * 15 一般小方材 54cm2m31987.032113.96226,446.540.45 * 16 一般大方材 101cm2
3、m32096.2320.08168.87* 17 水泥 32.5级kg0.3247,360.002,383.17* 18 碎石 570kg0.06436,331,517. 69 2,325,217.1 3 4.59 * 19 磨细粉煤灰kg0.0876,256.00546.77* 20 电焊条 结4224kg4.80031,382.04150,633.810.30 * 21 防锈漆kg14.000120.901,692.60* 22 现浇非泵送水下砼 (5-40)C35m3425.950744.20316,991.140.63 23 油漆溶剂油kg4.68012.4858.41* 24 硅酸钠(水玻璃)kg0.96073.6070.66* 25 铁丝 18#22#kg7.400221.541,639.38* 26 护壁泥浆m3121.000357.4343,249.020.09 * 27