1、工料机表 工程名称:A0桩基工程第 页1 序号名称规格单位市场价数量合价百分比 1 混凝土工工日78.0002,292.72178,832.3512.03 2 电焊工工日88.0006,331.73557,192.0637.50 3 其他工工日78.000929.8772,530.024.88 4 打桩工工日78.0006,628.18516,998.3434.79 * 5 起重工工日84.0001,909.93160,434.1210.80 * 6 钢丝绳 637 绳径34.5kg6.0003.7522.51* 7 钢桩帽kg5.5101,185.856,534.020.04 * 8 送桩器
2、kg6.2002,273.2314,094.000.09 * 9 方木板只60.000881.1852,870.800.34 * 10 圆木墩只30.00073.592,207.820.01 * 11 一般小方材 54cm2m31987.03229.5458,686.990.38 * 12 碎石 570kg0.0649,134,456.7 6 584,605.233.81 * 13 电焊条 结4224kg4.80017,690.1484,912.690.55 * 14 防锈漆kg14.0001,344.4118,821.710.12 * 15 油漆溶剂油kg4.680138.78649.48*
3、 16 其它材料费%767.63 17 草袋m22.6503,430.849,092.060.06 * 18 尼龙绳kg47.00011.84556.54* 19 其他铁件kg6.680315,758.772,109,268.5 7 13.74 * 20 工厂预制钢砼管桩(直径600)m31382.0007,336.4210,138,932. 44 66.04 21 预制钢筋混凝土方桩(制品)m31299.4301,747.832,271,182.7 4 14.79 * 22 履带式柴油打桩机 5t台班2292.717318.36729,899.3326.09 * 23 履带式柴油打桩机 7t台班2563.464248.10635,990.9022.74 * 24 履带式柴油打桩机 8t台班2655.919173.47460,727.5816.47 * 25 履带式起重机 10t台班589