1、工料机表 工程名称:C0桩基工程第 页1 序号名称规格单位市场价数量合价百分比 1 混凝土工工日78.0002,588.45201,898.7211.62 2 电焊工工日88.0007,517.83661,569.2238.07 3 其他工工日78.0001,037.8980,955.254.66 4 打桩工工日78.0007,774.37606,401.0634.90 * 5 起重工工日84.0002,223.84186,802.6810.75 * 6 钢丝绳 637 绳径34.5kg6.0004.3526.11* 7 钢桩帽kg5.5101,392.927,674.990.04 * 8 送
2、桩器kg6.2002,640.9916,374.120.09 * 9 方木板只60.0001,035.9762,158.200.35 * 10 圆木墩只30.00086.192,585.630.01 * 11 一般小方材 54cm2m31987.03234.3968,332.640.38 * 12 碎石 570kg0.06410,313,464. 46 660,061.733.68 * 13 电焊条 结4224kg4.80020,829.9999,983.930.56 * 14 防锈漆kg14.0001,596.2522,347.530.12 * 15 油漆溶剂油kg4.680164.7777
3、1.14* 16 其它材料费%911.420.01 17 草袋m22.6503,948.7010,464.450.06 * 18 尼龙绳kg47.00013.85651.13* 19 其他铁件kg6.680373,799.682,496,981.8 4 13.94 * 20 工厂预制钢砼管桩(直径600)m31382.0008,710.7312,038,228. 86 67.20 21 预制钢筋混凝土方桩(制品)m31299.4301,866.582,425,496.5 5 13.54 * 22 履带式柴油打桩机 5t台班2292.717375.28860,407.6626.46 * 23 履带式柴油打桩机 7t台班2563.464286.70734,945.5022.60 * 24 履带式柴油打桩机 8t台班2655.919205.97547,034.3216.82 * 25 履带式起重