1、工料机表 工程名称:展厅B1装饰第 页1 序号名称规格单位市场价数量合价百分比 1 综合人工工日87.500587.1251,373.300.67 * 2 油漆工工日85.000487.1641,408.930.54 3 抹灰工工日85.00029,031.092,467,642.9 9 32.42 * 4 油漆工工日85.00030,453.032,588,507.8 4 34.00 * 5 其他工工日78.00011,704.90912,982.2511.99 * 6 木工(装饰)工日86.00018,300.771,573,866.2 8 20.67 * 7 油漆工工日85.000-27
2、2.08-23,126.95-0.30 * 8 乳化沥青kg4.27513,251.4356,643.630.22 * 9 中粒式沥青混凝土(AC-20)t426.8303,580.211,528,143.0 7 5.86 * 10 抗滑表层(AK-13-0)t552.4201,524.58842,207.663.23 * 11 重质柴油kg5.300337.801,790.350.01 * 12 水m33.6201,876.846,794.180.03 * 13 角钢kg4.35311,720.0951,011.690.20 * 14 木屑kg0.120118,408.4314,209.01
3、0.05 15 一般小方材 54cm2m31987.0328.4116,712.930.06 * 16 成品踢脚板(硬木)m15.000261.763,926.470.02 * 17 水泥 32.5级kg0.32497,476.8431,563.000.12 * 18 白水泥kg0.7149,462.786,754.530.03 * 19 干粉砂浆 DM5.0kg0.270435,784.80117,661.900.45 20 干粉砂浆 DP5.0kg0.270-267,957.40-72,348.50-0.28 21 干粉砂浆 DP10.0kg0.280-445,274.37-124,676.82-0.48 22 干粉砂浆 DP15.0kg0.285246,269.6570,186.850.27 23 干粉砂浆 DP20.0kg0.290558,424.16161,943.010.62