1、武汉天地历史建筑再利用 Reuse of Wuhan Tiandi Historic Building 武汉概况 Wuhan Introduction 简称汉,别称“江城”。人口897万人,中国中部地区最大的城市。 Referred to as Han , alias Jiangcheng. Population of 8,970,000 people in central Chinas largest city. 世界第三大河长江及其最长支流汉水横贯市区,将武汉一分为三,形成 了武昌、汉口、汉阳三镇隔江鼎立的格局。 The worlds third longest river the Yan
2、gtze River and its tributaries cross Hanshui urban areas, will be one of Wuhan is divided into three, forming a Wuchang, Hankou, Hanyang three patterns of separation of the town river. 武汉一度层是中国内陆最大城市,位居亚洲前列,曾有“东方芝加哥” 的美誉。 Wuhan was once the largest city in inland China, the highest in the forefront
3、in Asia, there have been Chicago Oriental world. 武汉属北亚热带季风性湿润气候区,具有潮湿多雨、四季分明等特点。 Wuhan is of north subtropical humid monsoon climate zone, with rainy and humid, characterized by four distinct seasons. 武汉街头 Wuhan street 武汉建筑特点 Wuhan Architectural Features 武汉近代历史建筑既是半殖民地、半封 建时期中国的真实写照,又能反映工匠的 建造工艺。经历了近百年的风雨沧桑。 Wuhan is a modern history of building a semi- colonial, semi-feudal China, a true portraya