1、 Air quality implications of coal-ammonia co-firing Key findings Fine Particles (PM 2.5 )are an atmospheric pollutant that are responsible for thousands of premature deaths in Japan each year,and millions worldwide.We estimated total emissions of PM 2.5 and precursor gases at Unit 4 of Hekinan Therm
2、al Power Station,where 0%,20%and 50%of the energy demand is met by NH 3 (and the remaining energy demand is met by coal).We found that total emissions of PM 2.5 and precursor gases increase by 67%when NH 3 displaces 20%of the energy demand,and by 167%when NH 3 displaces 50%of the energy demand.These
3、 large increases in total emissions are due to the emissions of the PM 2.5 precursor gas NH 3 ,which are released during the shipping and combustion of this fuel.The increased total emission will likely lead to increased PM 2.5 concentrations and an even larger public health burden of this pollutant
4、.Contents Key findings 1 Contents 2 Impacts of coal on air pollution and climate 3 Fueling a power plant with ammonia 3 Uncertain climate impacts 4 Unexplored pollution impacts 5 Methodology for calculating pollutant emissions from the trial 6 Increased pollutant emissions 7 Implications for regiona
5、l public health 9 Implications for ecosystem health 10 Plans to scale up the energy transition 10 Comparisons with previous research 11 Conclusions and recommendations 12 References 14 Appendix A-Supplemental information(SI)20 Impacts of coal on air pollution and climate The combustion of coal is a
6、major source of electricity.However,burning this fuel also leads to the formation of air pollutants,which are detrimental to human health,and to the emissions of greenhouse gases,which are contributing to climate change.Exposure to Fine Particles (PM 2.5 )leads to a variety of respiratory and cardio
7、vascular illnesses,including chronic obstructive pulmonary disease,ischemic heart disease,lung cancer,lower respiratory infections,and diabetes (Burnett et al.,2014;Di et al.,2017).Globally,PM 2.5 contributes to 48 million premature deaths each year (Lelieveld et al.,2015;Burnett et al.,2018).These
8、premature deaths,combined with other non-fatal health illnesses caused by PM 2.5 ,cost the global economy USD 8 trillion,which is equivalent to 6.1%of the global gross domestic product (World Bank,2022).In Japan,PM 2.5 leads to 43,000 premature deaths each year(State of Global Air,2022).Coal combust
9、ion is a major source of PM 2.5 .Globally,coal combustion is responsible for 14%(560,000)of the annual PM 2.5 -related premature mortalities (McDuffie et al.,2021).Japan is the 4th highest producer of coal-fired electricity in the world (Ember,2021),and this energy source accounts for 28%of the nati
10、ons electricity (Our World in Data,2023).Because of this,coal combustion accounts for a significant fraction (12%)of the PM 2.5 concentration in Japan (McDuffie et al.,2021).In addition to PM 2.5 ,coal combustion also contributes to climate change,through emissions of greenhouse gases.As an alternat
11、ive fuel to coal,ammonia (NH 3 )can also be burnt in power stations to generate electricity,however,this process does not emit greenhouse gases.Ammonia is a corrosive chemical and exposure to high concentrations of it can cause immediate damage (severe irritation and burns)to the eyes,skin,and mucou
12、s membranes of the oral cavity and respiratory tract.In contrast to other energy carriers,such as hydrogen (H 2 ),the transport of ammonia is relatively easier,cheaper,and safer.Therefore,NH 3 could be a green alternative to coal combustion(MacFarlane et al.,2020;Xue et al.,2019).Fueling a power pla
13、nt with ammonia The Hekinan Thermal Power Station is Japans largest coal-fired power plant and is owned by JERA,which is Japans largest electricity producer.Over the past few years,Unit 4 of this power station has undergone technological developments to allow combustion of both coal and ammonia (co-
14、firing).Figure A1 in Appendix A -Supplemental information (SI)shows how the site will accommodate this new fuel source.In 2023,JERA will meet 20%of the energy demand at this unit through combusting 500,000 tons of ammonia (JERA,2022c).If successful,they plan to further increase the ammonia co-firing
15、 rate to 50%at this station by 2050,and to 100%for all their supercritical plants a?er 2050(IHI,2022 c).To satisfy this huge demand for ammonia,JERA has signed Memorandums of Understanding (MOUs)with the worlds biggest producers and transporters of ammonia (JERA,2022d;JERA,2022h;JERA,2022b).Using am
16、monia to supply 20%of the energy demand of Unit 4 of Hekinan Thermal Power Station will double Japans current consumption of this chemical.Because of this,JERA has been conducting international competitive bidding for ammonia supply (Nikkei,2023).As a result,JERA have now signed MOUs on the supply o
17、f ammonia with Yara and CF Industries,who have key production sites in,for example,USA (CF Industries,2023),Australia (Yara,2023),and Norway (Yara,2022).In anticipation of importing these large quantities of ammonia from distant regions,JERA have also signed MOUs with distribution companies to help
18、import the fuel via ships,which will also themselves be powered by the fuel (JERA,2022b).While it is uncertain exactly where the ammonia will be produced,JERA evidently expects to import it from distant locations and using ships that are also powered by this fuel.Uncertain climate impacts The use of
19、 ammonia as an alternative to coal has been widely scrutinised by the press (Reuters,2022 a;Reuters,2022 b;Service,2018)and scientific community (Hughes et al.,2022;MacFarlane et al.,2020),as the overall impacts of this energy transition on climate change are uncertain.Climate is affected by coal an
20、d ammonia,as these fuels can lead to the emission of carbon dioxide,which is a potent greenhouse gas.Carbon dioxide is emitted from coal when the fuel is burnt in the power station.In contrast,carbon dioxide is not emitted when ammonia is burnt,however it can be emitted during its chemical productio
21、n.There are multiple different methods for producing ammonia,which are distinguished by their source of energy and whether any emitted carbon dioxide is captured.NH 3 is produced from the combination of hydrogen (H 2 )and nitrogen (N 2 ),with hydrogen being produced from water,and nitrogen being pro
22、duced from air.These chemical processes require large quantities of energy.In the traditional method for creating ammonia,which is sometimes referred to as grey or brown,the energy demand is met by burning fossil fuels,which leads to the emissions of carbon dioxide.In blue ammonia production,fossil
23、fuels are still used as the energy source,but Carbon Capture and Storage (CCS)is used to remove the emitted carbon dioxide from the atmosphere.In green NH 3 production,renewable energy is used as the energy source,and no carbon dioxide is emitted.Clean NH 3 refers to a combination of blue and green
24、NH 3 production.However,clean methods for ammonia production suffer from methodological constraints,which have prevented its widespread use.Currently,ammonia production is a significant source of greenhouse gas emissions,as the majority of ammonia is produced from the grey/brown method.NH 3 producti
25、on leads to the emission of 500 million tonnes of carbon dioxide each year,which is equivalent to 2%of global carbon dioxide emissions(The Royal Society,2020).Scientific research demonstrates that the climate benefits of using ammonia in coal power plants are highly dependent on the method of ammoni
26、a production.If clean ammonia is used to displace 20%of all coal-fired power plants in Japan,carbon dioxide emissions are estimated to reduce by 40 million metric tons per year (Stocks et al.,2022).However,if the ammonia is produced via the grey/brown method,total emissions of carbon dioxide will no
27、t change,as the reduced carbon dioxide emissions at power plants in Japan will be entirely offset by increased carbon dioxide emissions outside of Japan where the ammonia is produced (Stocks et al.,2022).Hence,without major changes in the global chemical production sector,displacing coal with ammoni
28、a in the Japanese energy sector will not lead to any benefits on climate.Unexplored pollution impacts Displacing coal with ammonia also has the potential to affect PM 2.5 (Lu et al.,2017).The production,transport,and combustion of both coal and ammonia have the potential to affect PM 2.5 through the
29、 emissions of various species.PM 2.5 is both directly emitted into the atmosphere and formed in the atmosphere from precursor species,nitrogen oxides (NO x ),sulphur dioxide(SO 2 ),and NH 3 (see Figure A2 for schematic diagram).The emissions from coal and how they contribute to PM 2.5 are relatively
30、 well understood.Coal contributes to the formation of PM 2.5 through emissions of PM 2.5 during the mining of coal,and through emissions of PM 2.5 ,nitrogen dioxide and sulphur dioxide during the burning of coal.Coal power plants,including Unit 4 of Hekinan Thermal Power Station,provide measurements
31、 of these emissions each year.During the production of ammonia,0.001%is unintentionally emitted into the atmosphere (European Environment Agency,2021).To the best of our knowledge,emissions of ammonia during its transport have not been quantified.However,scientific research shows that during the shi
32、pping of liquid methane from a round trip from USA to Belgium,0.1%of the methane was emitted into the atmosphere,due to being directed vented into the atmosphere to avoid unstable pressures and used as a fuel to propel the ship (Balcome et al.,2022).The combustion of ammonia leads to the emissions o
33、f unreacted ammonia (otherwise known as ammonia slip),and nitrogen dioxide.The Japanese government reported that co-firing with coal and ammonia had no impact on emissions of nitrogen dioxide,as compared to when firing with coal only (Agency for Natural Resources and Energy,2021).The amount of ammon
34、ia which is le?unreacted and emitted into the atmosphere is,however,highly uncertain and is dependent on multiple different factors,with estimates ranging anywhere from 0.1 to 25%(Balcome et al.,2022;DieselNet,2023).Overall,displacing coal with ammonia will affect emissions of multiple different spe
35、cies (PM 2.5 ,SO 2 ,NO 2 ,NH 3 )from multiple different activities (production,transport,combustion).If changes in total emissions are large enough,they have the potential to affect atmospheric concentrations of PM 2.5 and human health.Methodology for calculating pollutant emissions from the trial I
36、n this study,we explored the air quality implications of co-firing Unit 4 of Hekinan Thermal Power Station with coal and ammonia.To achieve this,we quantified emissions of PM 2.5 and the precursor species under multiple coal:NH 3 fuel mix scenarios of (100:0,80:20,and 50:50),whilst keeping the total
37、 energy demand constant.We accounted for emissions from each aspect of the fuel lifecycles (mining,industrial production,transport,and combustion).We used a variety of different methods to calculate emissions,depending on the activity,fuel mix scenario,and species,and this is shown in Table 1.As JER
38、A currently operates under the 100:0 fuel scenario,and they already report emissions of PM 2.5 ,nitrogen oxides,and sulphur oxides from combustion (Koplitz et al.,2017);we directly use these values (Table 1).For the remaining scenarios for these activities,we assume emissions of PM 2.5 and sulphur d
39、ioxide decrease proportionally to the reduction in coal,and no change in emissions of nitrogen oxides.For the remaining activities,species,and scenarios,we combine underlying activity data (coal production,ammonia production,ammonia transport,ammonia combustion)with measured emission factors from th
40、e scientific literature.Note,for ammonia combustion,we assume an emission factor of 0.1%,which is at the lower end of the range of estimates (0.1 -30%),and therefore provides a conservative estimate.Table 1-Methods and data used to calculate emissions from the coal:NH 3 trial Activity Species 100:0
41、80:20 50:50 Coal Mining a PM 2.5 coal production x emission-factor NH 3 production a NH 3 NH 3 production x emission-factor NH 3 transport b NH 3 NH 3 transport x emission-factor Combustion d PM 2.5 Reported Reported x 0.8 Reported x 0.5 Combustion d SO 2 Reported Reported x 0.8 Reported x 0.5 Combu
42、stion d NO 2 Reported Reported Reported Combustion c NH 3 NH 3 burnt x emission-factor Source:Emission factors for coal mining a and NH 3 production a are taken from the European Environment Agency(2021),for NH3 production b are taken from Balcome et al.(2022),and for combustion c of NH 3 are from B
43、alcome et al(2022)and DieselNet(2023).Reported emissions of combustion d of coal are taken from Koplitz et al.(2017).Increased pollutant emissions Figure 1 shows emissions under the various fuel mix scenarios at Unit 4 of Hekinan Thermal Power Station.When coal is the only fuel source (100:0 scenari
44、o),total emissions across all species (PM 2.5 +SO 2 ,+NO 2 +NH 3 )and activities (production +transport +combustion)are 1,348 tons.The largest contributions to total emissions under this scenario are NO 2 (800 tons)and SO 2 (529 tons).Contrastingly,PM 2.5 emissions are negligible(19 tons)and there a
45、re no emissions of NH 3 .Displacing coal with ammonia leads to substantial increases in total pollutant emissions.Total emissions increase by 67%(from 1,348 to 2,249 tons)when the energy demand of NH 3 is increased from 0%(100:0 scenario)to 20%(80:20 scenario).Worse still,total emissions increase by
46、 167%(from 1,348 to 3,602 tons)when the energy demand of NH 3 is increased from 0%(100:0 scenario)to 50%(50:50 scenario).These large increases in total pollutant emissions are driven by emissions of NH 3 .When 20%(80:20 scenario)and 50%(50:50 scenario)of the energy demand is met by ammonia,emissions
47、 of NH 3 increase by 1,011 and 2,528 tons,respectively.In contrast,emissions reduce only marginally for PM 2.5 (4-9 tons)and SO 2 (106-265 tons),and emissions do not change at all for NO 2 .Therefore,displacing coal with ammonia leads to large increases in emissions of ammonia,which entirely offsets
48、 the negligible reductions in emissions of other species(PM 2.5 ,SO 2 ).Geographically,the increased pollutant emissions will be distributed both at Hekinan Thermal Power Station and internationally.The increased emissions of NH 3 due to replacing coal with this fuel are driven by emissions from the
49、 transport of this fuel (50%)and the combustion of this fuel (50%).Because of this,the increase in total emissions due to replacing coal with NH 3 are distributed at both Hekinan Power station and along the route of the ship transporting the fuel.Using coal as the only energy source (100:0 scenario)
50、,total pollutant emissions at Hekinan Thermal Power Station are 1,348 tons (see Figure 1,black star).When 20%(80:20 scenario)and 50%(50:50 scenario)of the energy demand is met by ammonia,total emissions at Hekinan Thermal Power Station increase to 1,738 tons(+30%)and 2,339 tons(+75%),respectively(se
51、e Figure 1,black star).Figure 1-Emissions of PM 2.5 and its precursor species (NO 2 ,SO 2 ,and NH 3 )at Unit 4 of the Hekinan Thermal Power Station Note:For each of the three fuel mix scenarios,we show emissions of PM 2.5 (red bar)SO 2 (green bar),NO 2 (orange bar),NH 3 (blue bar)from all activities
52、 (production+transport,+combustion),and total pollutant emissions(PM 2.5 +SO 2 +NO 2 +NH 3 )from combustion only(black star).Sources:Data used to create this figure is taken from Koplitz et al.(2017),European Environment Agency(2021),Balcome et al(2022)and DieselNet(2023).Implications for regional p
53、ublic health The increased emissions at Unit 4 of Hekinan Thermal Power Station could have far-reaching consequences for human health,as (i)the increased total emissions are substantial and include emissions from a particularly important species,(ii)PM 2.5 undergoes long-range transport in the atmos
54、phere,(iii)even small increases in PM 2.5 concentrations can lead to large increases in human mortality risk.The increased emissions at Unit 4 of Hekinan Thermal Power Station will likely increase atmospheric concentrations of PM 2.5 as the magnitude of emission increases are substantial (30-75%),an
55、d as it includes increases in emissions of ammonia,which is an especially strong precursor of PM 2.5 (Gu et al,2021).The increased atmospheric concentrations of PM 2.5 will likely be distributed over a large region,as PM 2.5 can persist in the atmosphere for several weeks,and undergo long range tran
56、sport.For example,PM 2.5 concentrations in Japan can be affected by emissions that originate thousands of kilometres away,such as from C hina (Aikawa et al.,2010).Therefore,it is highly likely that the emissions from Hekinan power station could affect PM 2.5 concentrations in nearby cities,such as N
57、agoya,which is only 50 km away and has a population of 2 million.The increased atmospheric concentrations of PM 2.5 will likely lead to a large increase in the public health burden,as even small changes in PM 2.5 concentrations can yield large increases in mortality risk(Vonodos et al.,2018).Implica
58、tions for ecosystem health The increased emissions have the potential to affect environmental health,through increased nitrogen deposition.The health of organisms are,in part,determined by the delicate balance in nutrients,including nitrogen,iron,and phosphorus.Changes in the nutrient balance can le
59、ad to eutrophication,which is the excessive growth of plants and algae.Increased nitrogen deposition due to human activity has altered the balance in nutrients so much that it has led to eutrophication in coastal ecosystems (Malone et al.,2020),degradation in marine ecosystem health (Kim et a.,2014
60、a;Kim et al.,2014 b;Ren et al.,2017),and biodiversity loss in Japan (Lin et al.,2021).The NH 3 emitted into the atmosphere during both the ship cruise and combustion will eventually be deposited into marine and terrestrial ecosystems,and further worsen this environmental issue.Plans to scale up the
61、energy transition A?er using 0.5 million tons of ammonia to fuel Unit 4 of Hekinan Thermal Power Station,there are several plans to scale up the displacement of coal with ammonia in other power stations.Scaling up this technology to the rest of the coal-fired power plant fleet across Japan,the natio
62、nal government expects the annual ammonia demand to increase to 3 million tons per year by 2023,and to 30 million tons by 2050 (METI,2022).JERA has signed MOUs to explore co-firing at other power stations across Japan (JERA,2022g),Malaysia,(JERA,2022a),and Singapore (JERA,2022f),as well as the scali
63、ng up of the international production (JERA,2022d;JERA,2022h)and shipping (JERA,2022b)of NH 3 .Other Japanese companies,such as Mitsubishi Heavy Industries (MHI)and IHI Corporation,have also signed MOUs on the exploration of co-firing coal and NH 3 in Indonesia (MHI,2022;IHI,2022b),Singapore (MHI,20
64、22 a),Taiwan (MHI,2022d),Thailand (MHI,2023),India (IHI,2022a)and Chile (MHI,2022c).This is of particular importance for Indonesia,where PM 2.5 already contributes to a staggering 94,000 premature deaths each year,with around 13%due to coal (McDuffie et al.,2021).Moreover,some of these projects inte
65、nd to use high ammonia co-firing percentages,reaching 30%(MHI,2022c)and 100%(JERA,2022f).Therefore,upon completion of the trial,it is very likely that the negative air quality impacts will not be confined only to Japan,but also translated to multiple different countries outside of Japan.Comparisons
66、with previous research In our research,we have found that ammonia co-firing at Unit 4 of Hekinan Thermal Power Station could increase PM 2.5 ,which is corroborated by independent research (Lu et al.,2017).We have reached our conclusion by using data from peer-reviewed scientific research to estimate
67、 the emissions from the long-term (1 year)ammonia co-firing (20-50%)at this unit which has a thermal capacity of 1000 MW,and have considered all aspects of the fuel lifecycles(mining,production,transport,and combustion).In contrast,previous research by Japanese power companies implies that (Hara,201
68、9;Fujimori,2019),under certain conditions,the impacts of ammonia co-firing on PM 2.5 can be minimised.However,in contrast to our methodology,their research uses data from their own experiments,which have not been independently reviewed.For instance,several of their experiments only assess low ammoni
69、a co-firing rates (620%)to meet low thermal inputs (10 MW)over short time scales,and none of their experiments consider emission during the international shipping of ammonia which we find be one of the dominant drivers for increased atmospheric emissions of ammonia from co-firing.Hence,it is highly
70、uncertain if the results from their experiments are representative of operational conditions.Indeed,the authors of the research performed by the power companies conclude that “evaluation of combustion characteristics on an actual scale and evaluation of various coal types and combustion conditions a
71、ssumed for operation are insufficient,and further technical studies are desired in the future prior to commercialization.In addition,many aspects of the combustion phenomenon when mixing coal,which is a solid fuel,and ammonia,which is a gaseous fuel,are still unknown.To this end,it is necessary to c
72、ontinue working to elucidate the underlying phenomena.”1 Conclusions and recommendations Air quality in Japan has improved significantly due to decades of scientific research,environmental policy,and investments in air pollution mitigation technologies (Wakamatsu et al.,2013).For instance,the Japane
73、se-average PM 2.5 concentration has decreased by 30%between 2010 and 2018 (Ito et al.,2021).However,PM 2.5 concentrations in Japan still exceed the guideline value suggested by the World Health Organization (WHO)and this pollutant is the 8th leading risk factor for premature mortality and disability
74、 (State of Global Air,2022).Our results indicate that Japanese improvements in air quality could be undermined,or even offset,by replacing coal with NH 3 .Our results suggest that displacing coal with NH 3 could increase concentrations of PM 2.5 due to large increases in emissions of NH 3 ,which is
75、a major precursor to PM 2.5 .Therefore,before the health of humans is risked by further expanding implementation of this technology,we recommend the following;Research into how the emissions change associated with displacing coal with ammonia at Unit 4 of Hekinan Thermal Power Station will affect PM
76、 2.5 concentrations.Our research shows large increases in emissions of NH 3 ,through both the transport and combustion of NH 3 ,which suggest an increase in concentrations and health impacts of PM 2.5 .Research into the emissions and air quality changes caused by scaling up co-firing at other power
77、stations across Japan and internationally,and using higher ammonia co-firing ratios.Overall,co-firing coal and ammonia in Japanese coal-fired power plants to meet the nations energy demand will lead to a huge increase in the demand for ammonia.We 1 This is a generated translation of an extract from
78、the original report that was written in Japanese(、実機規模燃焼特性評価、運上想定様炭種、燃焼条件対評価不分 、実化先今後技術的検討望;Hara,Central Research Institute of Electric Power Industry,2019,p.68-69;translated by DeepL Translator).conclude that quenching this increased thirst for ammonia could lead to huge increases in atmospheric em
79、issions of ammonia,which would have devastating effects on human health,ecosystem health,and the economy.References Agency for Natural Resources and Energy(2021).“燃料”?!(後 編)発電(Can Ammonia Be a“Fuel”?!(Part 2)-Carbon-free ammonia-fired power generation).https:/www.enecho.meti.go.jp/about/special/joho
80、teikyo/ammonia_02.html Aikawa et al.(2010).Significant geographic gradients in particulate sulfate over Japan determined from multiple-site measurements and a chemical transport model:Impacts of transboundary pollution from the Asian continent.Significant geographic gradients in particulate sulfate
81、over Japan determined from multiple-site measurements and a chemical transport model:Impacts of transboundary pollution from the Asian continent-ScienceDirect Burnett et al.(2014).An integrated risk function for estimating the Global Burden of Disease attributable to ambient fine particulate matter
82、exposure.https:/doi.org/10.1289/ehp.1307049 Burnett et al.(2018).Global estimates of mortality associated with long-term exposure to outdoor fine particulate matter.https:/doi.org/10.1073/pnas.1803222115 CF Industries(2023).Ammonia Production.https:/ DieselNet(2023).Selective Catalytic Reduction.htt
83、ps:/ Di et al.(2017).Air Pollution and Mortality in the Medicare Population.New England Journal of Medicine,376:2513-2522.10.1056/NEJMoa1702747 Ember(2021).Top 25 Coal Power Countries in 2020.https:/ember-climate.org/insights/research/top-25-coal-power-countries-in-2020/European Environment Agency(2
84、021).EMEP/EEA air pollutant emission inventory guidebook 2019.http:/efdb.apps.eea.europa.eu Fujimori(2019).Development of Pulverized Coal/Ammonia Mixed Combustion Technology for Coal-Fired Power Generation(炭発電微粉炭/混合燃焼技 術開発 社会実装向課題抽出).IHI Corporation(株式会社 IHI).Translated using DeepL.Gu et al.(2021).A
85、bating ammonia is more cost-effective than nitrogen oxides for mitigating PM 2.5 air pollution.DOI:10.1126/science.abf8623 Hara(2019).Study on Use of Ammonia in Existing Thermal Power Plants(既設発電所 利関検討).Central Research Institute of Electric Power Industry(般財団法 電中央研究所)-Translated using DeepL.Hughes
86、et al.(2022).Japan wants to burn ammonia for clean energy but it may be a pyrrhic victory for the climate.https:/ IHI(2022 a).IHI and Partners to Explore Ammonia Co-Firing at Indian Thermal Power Plant as Part of Japanese National Project.https:/www.ihi.co.jp/en/all_news/2022/resources_energy_enviro
87、nment/1198023_3488.ht ml IHI(2022 b).IHI Initiates Southeast Asias First Ammonia Co-Firing Pilot Facility at Operational Power Plant with View to Swi?Commercialization Across Region https:/www.ihi.co.jp/en/all_news/2022/resources_energy_environment/1198046_3488.ht ml IHI(2022 c).JERA and IHI Start a
88、 Demonstration Project of Technology to Increase the Ammonia Co-firing Rate at Hekinan Thermal Power Station.https:/www.ihi.co.jp/en/all_news/2021/resources_energy_environment/1197629_3360.ht ml Ito et al.,(2021).30 Years of Air Quality Trends in Japan.https:/doi.org/10.3390/atmos12081072 JERA(2022
89、a).Collaboration with IHI Asia Pacific for the expansion of ammonia usage in Malaysia.https:/www.jera.co.jp/english/information/20221026_995 JERA(2022 b).JERA Concludes MOUs with NYK and MOL Related to Cooperation in Transporting Fuel Ammonia.https:/www.jera.co.jp/english/information/20221121_1009 J
90、ERA(2022 c).JERA and IHI Move Up the Start of Large-Volume Co-firing of Fuel Ammonia in the Demonstration Project at Hekinan Thermal Power Station.https:/www.jera.co.jp/english/information/20220531_917 JERA(2022 d).JERA and Yara International Execute MOU for the Joint Project Development and Sales&P
91、urchase of Clean Ammonia.https:/www.jera.co.jp/english/information/20230117_1069 JERA(2022 f).Jurong Port,Mitsubishi Heavy Industries Asia Pacific and JERA Asia come together to explore establishing an ammonia direct combustion power plant.The project aims to accomplish the twin goals of supplying g
92、reen electricity and developing an ammonia bunk.https:/www.jera.co.jp/english/information/20220819_961 JERA(2022 g).JERA,Kyushu Electric Power,Chugoku Electric Power,Shikoku Electric Power,and Tohoku Electric Power to Consider Collaboration Aimed at the Adoption of Hydrogen and Ammonia.https:/www.je
93、ra.co.jp/english/information/20221129_1018 JERA(2022 h).JERA and CF Industries Execute MOU for the Joint Project Development and Sales&Purchase of Clean Ammonia.https:/www.jera.co.jp/english/information/20230117_1068 Kim et al.(2014 a).Impact of atmospheric nitrogen deposition on phytoplankton produ
94、ctivity in the South China Sea.https:/doi.org/10.1002/2014GL059665 Kim et al.(2014 b).Increasing anthropogenic nitrogen in the North Pacific Ocean.DOI:10.1126/science.1258396 Koplitz et al.(2017).Burden of Disease from Rising Coal-Fired Power Plant Emissions in Southeast Asia.10.1021/acs.est.6b03731
95、 Lelieveld(2015).The contribution of outdoor air pollution sources to premature mortality on a global scale.doi:10.1038/nature15371 Lin et al.(2021).Increased nitrogen deposition contributes to plant biodiversity loss in Japan:Insights from long-term historical monitoring data.10.1016/j.envpol.2021.
96、118033 Lu et al.(2017).PM 2.5 -related health impacts of utilizing ammonia-hydrogen energy in Kanto Region,Japan.10.1007/s11783-018-1005-3 Malone et al.(2020).The Globalization of Cultural Eutrophication in the Coastal Ocean:Causes and Consequences.https:/doi.org/10.3389/fmars.2020.00670 METI(2022).
97、Toward Zero-Emission Thermal Power Plants.https:/www.enecho.meti.go.jp/category/others/for_energy_technology/pdf/pamphlet_02 01.pdf McDuffie et al.(2021).Source Sector and Fuel Contributions to Ambient PM 2.5 and Attributable Mortality Across Multiple Spatial Scales.Nature Communications,12(3594).do
98、i.org/10.1038/s41467-021-23853-y MacFarlane et al.(2020).A Roadmap to the Ammonia Economy.Cell Press.https:/ 817FB2129BF2D798ACBDACBB80D399D0DDD60BAC8705F864287F920DF23D4E515056EAA 4FB5AD827&originRegion=eu-west-1&originCreation=20230213145056 MHI(2022 a).Keppel,MHI and DNV Sign Agreement to Explore
99、 Adoption of Ammonia-fired Gas Turbine on Jurong Island.https:/ MHI(2022 b).MHI and Indonesia Power Jointly Investigate Co-Firing with Hydrogen,Biomass and Ammonia in Power Plants Across Indonesia.https:/ MHI(2022 c).MHI Signs MoU with Chiles Guacolda Energa for Feasibility Study of Ammonia Co-Firin
100、g at a Coal-Fired Thermal Power Plant-Two-Phase Study through 2026 to Produce Detailed Plan for Demonstration of 30%Co-Firing.https:/ MHI(2022 d).MHI Signs MOU with Taiwan Power Company for Ammonia Co-Firing at the Linkou Thermal Power Plant-Four-Company Coalition Involving Mitsubishi Corporation an
101、d Mitsubishi Corporation Machinery.https:/ Nikkei(2023).JERA、燃料輸2社協議(JERA,Discussions with two companies to import fuel ammonia from the United States).https:/ World in Data(2023).Japan:Energy Country Profile.https:/ourworldindata.org/energy/country/japan Ren et al.(2016).21st-century rise in anthro
102、pogenic nitrogen deposition on a remote coral reef.DOI:10.1126/science.aal3869 Reuters(2022 a).Japans JERA,IHI to work on ammonia use at Malaysian coal power plants.https:/ b).Hooked on coal for power,Japan aims for ammonia fix.https:/ 021-10-29/The Royal Society(2020).Ammonia:Zero-carbon fertilizer
103、,fuel and energy store.https:/royalsociety.org/-/media/policy/projects/green-ammonia/green-ammonia-policy-briefing.pdf Service(2018).Ammoniaa renewable fuel made from sun,air,and watercould power the globe without carbon.https:/www.science.org/content/article/ammonia-renewable-fuel-made-sun-air-and-
104、wat er-could-power-globe-without-carbon State of Global Air(2022).Japan Air Pollution and Health Fact Sheet.https:/ Stocks et al.(2022).Global emissions implications from co-combusting ammonia in coal fired power stations:An analysis of the Japan-Australia supply chain.https:/doi.org/10.1016/j.jclep
105、ro.2021.130092 Vonodos et al.(2018).The concentration-response between long-term PM 2.5 exposure and mortality;A meta-regression approach.10.1016/j.envres.2018.06.021 Wakamatsu et al.(2013).Air Pollution Trends in Japan between 1970 and 2012 and Impact of Urban Air Pollution Countermeasures.http:/ko
106、reascience.or.kr/article/JAKO201306366997857.page World Bank(2022).The Global Health Cost of PM 2.5 Air Pollution:A Case for Action Beyond 2021.https:/elibrary.worldbank.org/doi/pdf/10.1596/978-1-4648-1816-5 Xue et al.(2019).Assessment of Ammonia as an Energy Carrier from the Perspective of Carbon a
107、nd Nitrogen Footprints.10.1021/acssuschemeng.9b02169 .Yara(2022).Yara fortsetter arbeidet med kutte Norges strste punktutslipp.https:/ -med-a-kutte-norges-storste-punktutslipp/#hegra-english Yara(2023).Yara Pilbara Fertilisers.https:/.au/about-yara/about-yara-australia/pilbara/yara-pilbara-fertilisers/Appendix A-Supplemental information(SI)Figure A1-Planned usage of ammonia at Heikanan Thermal Power Station(JERA,2023 c )Figure A2-Schematic diagram of how coal and ammonia can lead to PM 2.5 formation