1、GlobalRenewablesAllianceTRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030CRUCIAL STEPS TOWARDS 1.5C 32002TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 PREFACESince the Rio Earth Summit and the adoption of the United Nations Framework Convention on Climate Change(UNFCC
2、C)in 1992,the Conference of the Parties to the Convention(COP)has convened signatory Parties each year to determine ambitions and responsibilities,and identify and assess the progress of climate measures.The 21st session of the COP(COP21)led to the Paris Agreement,which mobilised collective action t
3、o limit the increase in global average temperature to well below 2C above pre-industrial levels,pursue efforts to limit the temperature increase to 1.5C above pre-industrial levels,and strengthen the global response to the threat of climate change.COP28,and the first Global Stocktake of the Paris Ag
4、reement,can be the turning point on climate action over this critical decade to accelerate a transition that puts economies on the path toward a new low-carbon,high-growth,sustainable economic model in a way that is both transformational and just.COP28 has the vision to deliver on the pillars of the
5、 Paris Agreement,focusing on specific action on four paradigm shifts:fast-tracking the energy transition and slashing emissions before 2030;transforming climate finance,by delivering on old promises and setting the framework for a new deal on finance;putting nature,people,lives and livelihoods at th
6、e heart of climate action;and mobilising for the most inclusive COP ever.Daryl Han/unsplash3 CRUCIAL STEPS TOWARDS 1.5C The International Renewable Energy Agency(IRENA)is an intergovernmental organisation,comprising 168 Member States and the European Union,that supports countries in their transition
7、 to a sustainable energy future.IRENA serves as a centre of excellence;a repository of policy,technology,resource and financial knowledge;and the principal platform for international co-operation on renewable energy.IRENA promotes the widespread adoption and sustainable use of all forms of renewable
8、 energy,including bioenergy,geothermal,hydropower,ocean,solar and wind energy,in the pursuit of a global energy transition that delivers sustainable development,energy access,energy security and low-carbon economic growth and prosperity.www.irena.orgThe Global Renewables Alliance(GRA)represents the
9、leading international industry associations across renewable energy and serves as a unified renewable energy voice on a global scale.The alliance was established in 2022 and comprises founding members,the Global Wind Energy Council,the Global Solar Council,the International Hydropower Association,th
10、e International Geothermal Association,the Long Duration Energy Storage Council and the Green Hydrogen Organisation.The GRAs mission is to increase ambition and accelerate the uptake of renewable energy across the world,in line with a credible 1.5C pathway.As such,it collaborates and communicates wi
11、th governments,investors,civil society and other key stakeholders on collective actions which can enable the broad scale-up of renewable energy.While each country and region will adopt a nationally determined approach to the energy transition,the GRA advocates for the acceleration of wind,solar,hydr
12、o and geothermal power,and essential technologies like long-duration storage and green hydrogen.This will ensure that future global energy systems are not only clean,but secure and just.www.globalrenewablesalliance.org/4TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 DISCLAIMER AND A
13、CKNOWLEDGEMENTSThis publication and the material herein are provided“as is”.All reasonable precautions have been taken by the copyright holders to verify the reliability of the material in this publication.However,neither the COP28 Presidency,IRENA,GRA,nor any of their officials,agents,data or other
14、 third-party content providers provides a warranty of any kind,either expressed or implied,and they accept no responsibility or liability for any consequence of use of the publication or material herein.The information contained herein does not necessarily represent the views of all Members of IRENA
15、 or the GRA and its constituent associations.The mention of specific companies or certain projects or products does not imply that they are endorsed or recommended by the COP28 Presidency,IRENA or the GRA in preference to others of a similar nature that are not mentioned.The designations employed an
16、d the presentation of material herein do not imply the expression of any opinion on the part of the COP 28 Presidency,IRENA or the GRA concerning the legal status of any region,country,territory,city or area or of its authorities,or concerning the delimitation of frontiers or boundaries.Szilard Toth
17、/shutterstock5 CRUCIAL STEPS TOWARDS 1.5C COP28,IRENA and GRA,2023Unless otherwise stated,material in this publication may be freely used,shared,copied,reproduced,printed and/or stored,provided that appropriate acknowledgement is given to the author organisations as the source(s)and copyright holder
18、s.Material in this publication that is attributed to third parties may be subject to separate terms of use and restrictions,and appropriate permissions from these third parties may need to be secured before any use of such material.Citation:COP28,IRENA and GRA(2023),Tripling renewable power and doub
19、ling energy efficiency by 2030:Crucial steps towards 1.5C,International Renewable Energy Agency,Abu Dhabi.ISBN:978-92-9260-555-1AcknowledgementsThis report is the result of a collaboration between the COP28 Presidency,the International Renewable Energy Agency and the Global Renewables Alliance.The r
20、eport draws extensively on the analysis presented in IRENAs World Energy Transitions Outlook 2023:1.5C pathway and several other IRENA reports,complemented by various reports published by the members of the GRA.The report was co-ordinated and compiled by:Francis Field,Ute Collier,Ricardo Gorini,Yong
21、 Chen,Diala Hawila,Michael Taylor and Faran Rana(IRENA);Joyce Lee and Reshmi Ladwa(GWEC);Bruce Douglas and Beniamin Strzelecki(GRA);and Harley Higgins Watson and Yasin Kasirga(COP28).Valuable inputs and review were provided by Roland Roesch,Rabia Ferroukhi,Elizabeth Press,Nicholas Wagner,Mengzhu Xia
22、o,Sean Collins,Stuti Piya,Gerardo Escamilla,Rodrigo Leme,Fransisco Boshell,Arina Anisie,Gayathri Prakash,Isaline Court,Ilina Radoslavova Stefanova and Paul Komor(IRENA);Adnan Z.Amin(COP28);Ben Backwell(GWEC);Julia Souder,Alex Campbell and Gabe Murtaugh(Long-Duration Energy Storage Council);Mt Heisz,
23、Abdallah Alshamali and Alyssa Pek(Global Solar Council);Antonio Arruebo,Jonathan Gorremans and Raffaele Rossi(SolarPower Europe);Debbie Gray and Rebecca Ellis(International Hydropower Association);Jonas Moberg and Simran Sinha(Green Hydrogen Organisation);Mohamed Jameel Al Ramahi and Nikolas Meitani
24、s(Masdar).The report was developed with the support of the Boston Consulting Group.The authors wish to thank Rich Lesser,Michel Fredeau,Pattabi Seshadri,Tamer Obied,Vishal Mehta,Lars Holm,Ali Houjeij,Maria Agostini and Sasha Riser.Communications and digitalisation support were provided by Nicole Boc
25、kstaller,Daria Gazzola and Manuela Stefanides(IRENA);the COP28 Communications team;and Alexander Bath(GRA).The report was produced by IRENA,with graphic design by weeks.de Werbeagentur GmbH.6TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 Forewords .08Introduction .15CONTENTSTRIPLING
26、 UP,DOUBLING DOWN RENEWABLE POWER AND ENERGY EFFICIENCY IMPROVEMENTS TO 2030 .18 RENEWABLE POWER .19 ENERGY EFFICIENCY .28x3x2TODAYx3x2TRIPLINGRENEWABLE POWERDOUBLINGENERGYEFFICIENCY2030 Agnieszka Swierczek/unsplash MAGNIFIER/shutterstock Diana Parkhouse/unsplash7 CRUCIAL STEPS TOWARDS 1.5C ENERGY T
27、RANSITION ENABLERS AND POLICY PRIORITIES .30 INFRASTRUCTURE AND SYSTEM OPERATION .31 Power grids .33 Energy storage .34 End-use electrification and sector coupling .36 Demand-side management .38 POLICY AND REGULATION .39 Improving energy efficiency .41 Market incentives and fiscal policy .42 Power m
28、arket design and regulation.44 Streamlining permitting .46 Reducing negative impacts;maximising social and environmental benefits .47 SUPPLY CHAINS,SKILLS AND CAPACITIES .49 Building resilient supply chains .49 Education,training and capacity-building .50 SCALING UP PUBLIC AND PRIVATE FINANCE .52 En
29、hancing international collaboration .55CONCLUSION FROM AMBITION TO ACTION .57References .60 Marcel Poncu/shutterstock Marcel Poncu/shutterstock8TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 FOREWORDS Diana Parkhouse/unsplash9 CRUCIAL STEPS TOWARDS 1.5C Dr Sultan Al Jaber COP28 Pres
30、ident-DesignateTripling the deployment of renewable power generation and doubling energy efficiency are amongst the most important levers to cut greenhouse gas emissions.The world has already made great strides by expanding global renewable energy capacity and becoming more energy efficient;but prog
31、ress so far has been too slow.The Global Stocktake has told us exactly how far off track we are.We need to cut 22 gigatonnes of greenhouse gases in the next 7 years in order to keep 1.5C within reach.The phase-down of fossil fuels is inevitable and essential,but it must be responsible.To deliver a j
32、ust and orderly energy transition while advancing socio-economic development and ensuring energy affordability,reliability and sustainability,we must rapidly accelerate our efforts to ramp up renewable energy.Now is the time to turbocharge solutions and meet the urgency of the moment with ambitious
33、and determined action.Ahead of COP28,we are building global momentum and consensus in support of our target to triple global renewable power generation and double energy efficiency.This report outlines actionable solutions that can enable the progress we need and demonstrates that this target is amb
34、itious but achievable.I am now calling on everyone to come together,commit to common targets,and take comprehensive domestic and international action,as outlined in this report,to make our ambitions a reality.10TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 Francesco La Camera Direc
35、tor-General,International Renewable Energy AgencyOur mission is as clear as it is urgent:to keep the 1.5C target within reach,we must triple renewable power capacity and double energy efficiency by 2030.IRENAs World Energy Transitions Outlook,which provides the analytical foundation for this report,
36、warns that the energy transition is dangerously off-track,demanding immediate,radical collective action.A significant acceleration of renewable energy deployment,coupled with tangible progress in energy efficiency and end-use electrification,is essential to put the world back on track to achieve the
37、 goals of the Paris Agreement.This will require concerted action to urgently address deeply entrenched systemic barriers across infrastructure,policy and institutional capacities stemming from systems and structures created for the fossil-fuel era.We must now focus on building the necessary infrastr
38、ucture and investing at scale in grids to accommodate a growing share of renewable energy;establish policy and regulatory architecture that can facilitate targeted public and private sector investments in the energy transition;and strategically realign institutional capacities to help ensure skills
39、and capabilities match the energy system of the future.This is especially important for developing countries,where we must deliver on our commitments to sustainable development,ensuring no one is left behind.COP28 marks the year of the first Global Stocktake,in which the world reflects on its progre
40、ss in implementing the Paris Agreement.It is vital that collective action be galvanised following this key milestone in our journey toward a climate-safe existence to ensure the forthcoming round of Nationally Determined Contributions in 2025 represents a transformative leap forward,realigning us wi
41、th the 1.5C goal.This report outlines the essential actions governments must prioritise to achieve this objective.11 CRUCIAL STEPS TOWARDS 1.5C Bruce Douglas Chief Executive Officer,Global Renewables AllianceThis is the make or break decade to avoid the most catastrophic impacts of climate change.A
42、global energy transition that accelerates renewable energy and phases out fossil fuels is the only way to build a clean,secure and just future.Double down,triple up:Tripling global renewable energy capacity and doubling energy efficiency rates by 2030 are the most impactful commitments we can undert
43、ake now to achieve a 1.5C pathway.This would deliver cleaner electricity systems,access to affordable energy and green jobs for millions of people,billions of dollars in public and private capital to foster climate-resilient growth,and reduce loss and damage for nature and people wrought by harmful
44、climate change.To achieve these targets,we need to dramatically ramp up wind power,solar power,hydropower and geothermal power.This would set the stage to scale long-duration energy storage and green hydrogen,ensuring energy systems are not just clean,but secure and resilient.On average,1000 GW of r
45、enewables needs to be installed each year for the rest of the decade to bring total renewables capacity to 11000 GW by 2030.As the growth curve will rise over the course of the decade,the renewables industry believes at least 1500 GW of renewables capacity could be installed in 2030 alone.Global lea
46、ders must commit to these targets at COP28.However,progress towards 2030 goals cannot be taken for granted.Policy makers must work hand-in-hand with industry and civil society to urgently implement the enabling actions in this report,centred on:infrastructure and system operation;policy and regulati
47、on;and supply chains,skills and capacities.Critically,these areas must be reinforced by low-cost financing and international collaboration.This is a unique”once in a generation“opportunity,but we need urgent action to scale renewable energy in every region of the world.Only then can we protect the p
48、lanet and secure a liveable future for all.12TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 KEY RECOMMENDATIONSTOTAL GLOBAL RENEWABLE POWER GENERATION CAPACITY WILL NEED TO TRIPLE BY 2030 to reach more than 11000GW under IRENAs 1.5C Scenario in the World Energy Transitions Outlook,w
49、ith solar photovoltaic(PV)and wind power accounting for about 90%of renewable energy capacity additions.ENERGY EFFICIENCY IMPROVEMENTS MUST DOUBLE BY 2030 TO REMAIN ON A 1.5C PATHWAY.In IRENAs 1.5C Scenario this will be driven by a combination of efficient technologies in end-use sectors and extensi
50、ve electrification.These vital milestones must be achieved to keep the global energy transition on track to meet Paris Agreement goals.A COMPREHENSIVE MIX OF POLICIES IS NEEDED TO ACHIEVE THESE AMBITIOUS TARGETS.Aside from deployment and enabling policies,structural change is needed to ensure the tr
51、ansition to an energy-efficient economy and a renewables-based power system is just and fair,and provides benefits for all.ENERGY EFFICIENCY POLICY MEASURES should include:the adoption of targets with specific time horizons;strong regulatory frameworks including building codes and energy efficiency
52、standards for appliances;fiscal and financial incentives;and public campaigns to build awareness of the role of energy efficiency measures,public transport and green mobility for cost savings and collective decarbonisation goals.13 CRUCIAL STEPS TOWARDS 1.5C RENEWABLE ENERGY DEPLOYMENT REQUIRES ENAB
53、LING MEASURES THAT GO BEYOND REGULATIONS OR FISCAL AND FINANCIAL INCENTIVES.The organisational structures of power sectors must be reshaped to integrate a higher share of renewables.Procurement mechanisms must be designed in a way that strengthens value chains and trade,and industrial policies must
54、be fit for building resilient supply chains.Education,training,re-skilling and up-skilling should be prioritised;women and under-represented groups must be empowered;and collaboration between industry,civil society,policy makers and other key stakeholders should be encouraged.EXISTING ELECTRICITY IN
55、FRASTRUCTURE SHOULD BE EXPANDED AND MODERNISED TO CREATE A NEW ENERGY SYSTEM FIT FOR RENEWABLES.There is an urgent need to boost cross-sector infrastructure planning,increase cross-border co-operation and develop regional power grids.Action is also needed to drive grid modernisation and expansion an
56、d ensure supply-side flexibility and demand-side management.RENEWABLE POWER CAPACITY SHOULD BE INCREASED MORE RAPIDLY IN DEVELOPING COUNTRIES,given their growing electricity demand and the important role of renewables in addressing the significant energy access deficit in these countries.WE MUST RAP
57、IDLY MOBILISE PUBLIC AND PRIVATE FINANCE TO TRIPLE RENEWABLE POWER CAPACITY AND DOUBLE ENERGY EFFICIENCY.Annual average investment in renewable power generation must reach USD1300billion by 2030,compared to 486billion in 2022.In the developing world,we must minimise investment risks and provide acce
58、ss to low-cost financing.The global financial architecture must be reformed to support the energy transition in the Global South.Climate-related funding from multilateral development banks must be ramped up,and public capital should be redirected from the fossil fuels sector to renewable energy.THIS
59、 WILL REQUIRE STRONG INTERNATIONAL COLLABORATION.Immediate efforts are required to facilitate and contribute to multilateral initiatives that promote knowledge sharing and capacity building to deliver a just transition whilst also safeguarding nature and biodiversity.Collaboration is urgently requir
60、ed to foster collective action on governance,climate finance and innovation.North-South and South-South dialogues should be cultivated;groups like the G7 and G20 must mobilise support and investment;and just transition funds should be established and operationalised in emerging economies.14TRIPLING
61、RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 Curioso.Photography/shutterstock15 CRUCIAL STEPS TOWARDS 1.5C The United Nations Intergovernmental Panel on Climate Change(IPCC),in its latest Assessment Report(AR6),sent a clear message to the world that this decade is critical to our success i
62、n limiting global surface temperature increase to 1.5C above pre-industrial levels by the end of this century(IPCC,2023).There is an urgent need for rapid and immediate action to reduce global net anthropogenic carbon dioxide(CO2)emissions by almost 50%from 2019 levels by 2030,with a significant pro
63、portion of this reduction occurring within the field of energy.However,the energy transition remains off-track and global greenhouse gas emissions have reached record levels.IRENAs flagship report,World Energy Transitions Outlook 2023:1.5C pathway,shows that even if current pledges and plans made by
64、 national governments including Nationally Determined Contributions(NDCs),long-term low greenhouse gas emission development strategies(LT-LEDS)and other commitments are fully implemented,this would serve to reduce CO2 emissions by only 6%in 2030 compared to 2022 levels.This is far below the emission
65、 reductions required to place the world on a 1.5C pathway.The message is clear:we cannot limit global surface temperature increase to 1.5C above pre-industrial levels by the end of this century without rapid,sustained and concerted action.COP28 marks the year of the first Global Stocktake(GST),throu
66、gh which policy makers,industry,financial institutions,civil society and other stakeholders will reflect on the progress achieved in implementing climate pledges since the adoption of the Paris Agreement in 2015.The World Energy Transitions Outlook 2023 concludes that a significant acceleration in t
67、he deployment of renewable energy,energy storage and renewable fuels,coupled with tangible progress in energy efficiency and electrification of end-use sectors,are required to put the world back on track in this decade to meet global climate goals(IRENA,2023a).1INTRODUCTION1)A reduction in the use o
68、f fossil fuels for power generation-particularly in carbon-intensive generation fleets without abatement measures-is vital to the success of the energy transition,albeit beyond the scope of this report.By 2030,fossil-fired electricity generation would fall by around 47%from the 2022 level,while coal
69、-and-oil-based generation would fall to zero by mid-century,under the IRENA 1.5C Scenario(IRENA,2023a).16TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 The global energy transition requires a significant reduction in carbon emissions across the entire energy industry,as well as in e
70、nd-use sectors.Leveraging low-cost solar PV,onshore and offshore wind,and other renewable electricity generation sources,the power sector must lead the way as solutions in other sectors scale up.Accelerating the progress of the transition worldwide requires a holistic approach,backed by systemic inn
71、ovation to transform existing structures and systems built for the fossil fuel era.Whilst the phase down of fossil fuels is both essential and inevitable,it must also be responsible.The transition needs to be delivered in a way that ensures energy security,accessibility and affordability,while also
72、sustaining socio-economic development and adopting nature-positive approaches.The speed at which the transition is achieved will be determined by how quickly zero-carbon alternatives can be introduced and scaled up.Greater ambition and stronger collective action are immediately required to accelerat
73、e progress,particularly in renewable energy and energy efficiency.Against this backdrop,policy makers,energy authorities,industry and civil society have an opportunity to align at COP28 to agree global targets to triple renewable power generation capacity and double the energy efficiency improvement
74、 rate by 2030.These goals represent some of the most important levers for change to advance the energy transition this decade.This report consolidates high-level analysis of these targets,detailing existing shortfalls and identifying key enablers to resolve them.It represents global perspectives wit
75、hin the renewable energy and climate change space,with the COP28 Presidency,the International Renewable Energy Agency(IRENA)and the Global Renewables Alliance(GRA)uniting to provide concrete recommendations on the means to meet these renewable power and energy efficiency targets.The solutions presen
76、ted are technologically mature,cost-competitive and commercially available,and can be scaled up rapidly in most countries around the world;indeed,utility-scale solar PV and onshore wind are already the most cost-competitive sources of new electricity supply in most countries today(IRENA,2023b).Accel
77、erating progress in renewable energy deployment and energy efficiency improvement measures this decade would contribute to a cleaner energy system,improve energy security and reduce exposure both in industry and for consumers to the damaging risks of highly volatile fossil fuel prices.It would also
78、improve air quality and reduce health costs;deliver universal access to clean affordable energy;and provide greater collective security and well-being.With the right policies in place,the global energy transition will also bring extensive socio-economic benefits,including in the form of job creation
79、 and income generation.zorazhuang/iStock17 CRUCIAL STEPS TOWARDS 1.5C The key enabling frameworks,policies and recommendations detailed in this report provide concrete advice to governments around the world on the necessary steps required between now and 2030 to meet these targets.Realising the targ
80、ets,in accordance with IRENAs 1.5C Scenario,would require a cumulative global installed renewable electricity generation capacity of over 11000GW,and a doubling of the annual energy efficiency improvement rate from the current level by 2030(IRENA,2023a).It is essential that global leaders convening
81、at COP28 demonstrate the collective will to set a new pace for action this decade by committing to these targets;in short,this is a critical step in a critical decade to keep the 1.5C target within reach.This will require accelerated actions in many areas,in particular modernising and expanding phys
82、ical energy infrastructure;improving power system operations;establishing the right policies and regulatory frameworks;building resilient supply chains;and developing skills and institutional capacities.These actions must be underpinned by a significant increase in public and private financing,parti
83、cularly to support the developing world.To ensure the energy transition is both just and inclusive,greater international collaboration is also needed.Worldwide,around 675 million people still lack access to electricity and 2.3billion lack access to clean cooking methods(IEA et al.,2023).Providing re
84、newable energy to those populations would contribute significantly to achieving Sustainable Development Goal 7 to Ensure access to affordable,reliable,sustainable and modern energy for all.TODAYx3x2TRIPLINGRENEWABLE POWERDOUBLINGENERGYEFFICIENCY203018TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFI
85、CIENCY BY 2030 x3x2RENEWABLE POWERENERGY EFFICIENCY MAGNIFIER/shutterstock19 CRUCIAL STEPS TOWARDS 1.5C Our success in reducing greenhouse gas emissions this decade will determine whether global temperature rise can be limited to 1.5C.According to IRENAs World Energy Transitions Outlook 2023,global
86、energy-related CO2 emissions would need to decline significantly to 23gigatonnes of CO2(GtCO2)in 2030,from the record high of 36.8GtCO2 in 2022(IRENA,2023a).IRENAs 1.5C Scenario identifies a technically and economically feasible pathway to an energy future that is consistent with Paris Agreement goa
87、ls.It concludes that energy efficiency and electrification powered by renewables,clean hydrogen and direct use of renewables are driving the transition;but the sheer scale and extent of this transition requires a rapid and systemic transformation of the energy system.Despite the progress achieved to
88、 date,the current deployment of energy transition technologies is insufficient in speed and scale to achieve the Paris Agreement goals.The energy transition requires an urgent and significant acceleration across energy supply,end-use sectors and enabling technologies-particularly the deployment of r
89、enewable power generation systems in more countries and regions.TRIPLING UP,DOUBLING DOWN RENEWABLE POWER AND ENERGY EFFICIENCYIMPROVEMENTS TO 2030RENEWABLE POWER3x20TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 By 2030,global total installed renewable power generation capacity wou
90、ld need to expand more than three-fold,from 3382GW in 2022 to 11174GW,according to IRENAs 1.5C Scenario.Specifically,installed solar PV capacity would rise to more than 5400GW,from 1055GW in 2022,and wind installations would surpass 3500GW(3040GW onshore and 500GW offshore),up from 899GW in 2022,ove
91、r the same period(IRENA,2023a,2023c).The share of variable renewable energy(VRE)such as solar PV and wind power in electricity generation would rise from 10%of the total electricity generated in 2021 to 46%by 2030,requiring additional flexibility in the operation of the energy system.After solar PV
92、and wind power,the third-largest increase in generation capacity would be in hydropower;by 2030,global installed hydropower capacity(excluding pumped hydro)would grow by almost 17%from the 2022 level,reaching 1465GW under the IRENA 1.5C Scenario.Sanwenyu1/iStock Warmlight/iStock21RECENT YEARS2022202
93、12021202120222022Notes:GW=gigawatt;TWh=terawatt-hours;VRE=variable renewable energy.Total installed capacity(GW)Total installedrenewable capacity(GW)Total generation(TWh)Renewable energy share in generation(%)VRE share in generation(%)Renewable energy sharein installed capacity(%)2836540140839914462
94、33821117428%68%40%77%10%46%2030 CRUCIAL STEPS TOWARDS 1.5C FIGURE 1 Key performance indicators for achieving the 1.5C Scenario in the Decade for ActionBased on:(IRENA,2023a,2023c).22TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 This suggests average renewable energy capacity additi
95、ons of approximately 1000GW each year in the current decade more than three times the installed renewable capacity added in 2022(292GW,including 189GW of solar and 73GW of wind power)(IRENA,2023c).With average annual additions of 551GW of solar PV and 329GW of wind power to 2030,solar PV and wind po
96、wer would dominate annual power generation capacity additions this decade.Energy storage capacity would expand in tandem,with cumulative global battery storage increasing by a factor of 21,from 17GW in 2020 to 359GW in 2030(IRENA,2023a).Renewable power additions this decade may not be linear,however
97、,with many factors impacting the rate of growth.Given that annual installation levels in 2022 were less than one-third of the 1000GW average annual installation rate required to 2030 under IRENAs 1.5C Scenario,growth of renewable power technologies over the remaining period of this decade will need
98、to accelerate immediately(IRENA,2023a).Some projections of solar growth foresee that 1000GW of annual solar PV installations alone may be reached as soon as 2028(Haegel et al.,2023).To meet the tripling renewable power target,annual renewable additions need to ramp up as fast as possible,and as earl
99、y as possible,in this decade.Countries and regions will follow different trajectories in accelerating the deployment of renewable power capacity.Those with lower barriers to investment,higher renewable energy resource potential and more mature power markets among other key enabling factors should ai
100、m for greater increases in renewable capacity and economy decarbonisation.This will allow them to assist others by sharing lessons learnt,technological and technical know-how,and experiences in establishing the right conditions for the scaling up of renewables.Under the IRENA 1.5C Scenario,the globa
101、l solar PV market would be dominated by G20 countries;but outside this group,cumulative capacity will need to surpass 900 GW by 2030,while the cumulative capacity in G20 countries would reach approximately 4530GW.For wind,China,the United States,Canada,Brazil and several European countries have high
102、 onshore wind potential,while the majority of expansions in offshore wind would be in four key markets(China,EU-27,the United States and India),accounting for more than 60%of offshore wind deployment by 2030.For hydropower,G20 countries together would account for 79%(over 1150GW)of global hydropower
103、 capacity by 2030,with almost 305GW of total capacity spread across the rest of the world.Lanski/iStock23Total sharein installedcapacityTotal sharein installedcapacityAll values in GWHydro(excl.pumped)RenewablepowerFigure 2b202211 1743 3821 255GWGW23%40%VRERenewablepower62%77%VREBioenergy151Hydro(ex
104、cl.pumped)1 465Bioenergy343Solar PV1055Windoffshore63Wind onshoreGeothermal836CSP197Windoffshore494Windonshore3040CSP6.6Marine72Marine0.5Geothermal105Solar PV5457203014.6 CRUCIAL STEPS TOWARDS 1.5C It is important that renewable power generation capacity,including both grid-connected and off-grid sy
105、stems,expands more rapidly in the developing world,given its growing electricity demand;renewables can and should play an important role in addressing the significant energy access deficit in developing countries,through both grid and off-grid applications.Currently,despite vast potential,many devel
106、oping countries are lagging behind in terms of their deployment of renewable power systems and related investments;for instance,of the cumulative investment of USD2841billion in renewable energy in 20002020 worldwide,Africa only received USD60billion,or 2%(IRENA and AfDB,2022).Accelerating renewable
107、 power deployment is not only beneficial from a climate perspective;the economic case for this acceleration is now compelling,given the dramatic improvements in the competitiveness of renewable energy sources such as solar and wind power.FIGURE 2 Global installed renewable electricity generation cap
108、acity in the 1.5C Scenario,2022 and 2030Notes:CSP=concentrated solar power;GW=gigawatt;PV=photovoltaic;VRE=variable renewable energy.Bioenergy includes biogas,biomass waste and biomass solid.Based on:(IRENA,2023a).24TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 In 2010,the global w
109、eighted average levelised cost of electricity(LCOE)of onshore wind was USD0.107/kilowatt hour(kWh)95%higher than the lowest fossil fuel cost of USD0.056/kWh.Yet,by 2022,the global weighted average LCOE of new onshore wind projects was USD0.033/kWh 52%lower than the cheapest fossil fuel-fired option,
110、at USD0.069/kWh(Figure3).This improvement was surpassed by that of solar PV,however.In 2010,solar PV had a global weighted average LCOE of USD0.445/kWh 710%more expensive than the cheapest fossil fuel-fired option;but by 2022,a spectacular decline in costs to USD0.049/kWh made solar PVs global weigh
111、ted average LCOE 29%lower than the cheapest fossil fuel-fired option(IRENA,2023b).FIGURE 3 Cost competitiveness of solar and wind power,2010-2022Solarphotovoltaic20102022Renewables LCOE(greater than fossil fuel)Renewables LCOE(less than fossil fuel)900%800%700%600%500%400%300%200%100%0-100%95th perc
112、entileWeighted average5th percentile+710%Concentratedsolar power20102022+591%+71%+95%-52%Windonshore20102022Windoffshore20102022+258%+17%-29%Lowestfossil fuelLCOENote:LCOE=levelised cost of electricity.Based on:(IRENA,2023a).25 CRUCIAL STEPS TOWARDS 1.5C 2)It is important to note that renewables off
113、er a fundamentally different hedge to rising fuel costs.Hedging fossil fuel prices comes at a cost,because fossil fuel prices are inherently volatile and investors must be compensated for taking on the risk.With renewable power,the opposite is true;the cheapest renewable electricity comes when the p
114、rojects lifetime generation is contracted for,as this reduces project risk and ensures the lowest cost of capital.Hedging the electricity supply system with renewables therefore comes at a discount,not a cost addition.The global weighted-average LCOE of offshore wind fell from being 258%more expensi
115、ve than the cheapest fossil fuel option in 2010 to being just 17%more expensive in 2022,with costs falling from USD0.197/kWh to USD0.081/kWh.Concentrated solar power(CSP)saw its global weighted-average LCOE fall from 591%higher than the cheapest fossil fuel option in 2010 to 71%higher in 2022(IRENA,
116、2023b).While hydropowers global weighted average LCOE increased in 2021-2022 to USD 0.061/kWh-largely owing to the development of more challenging and remote sites it remains cheaper than new fossil-fuel fired options.This is also true for geothermal projects,with a global weighted-average LCOE of U
117、SD 0.056/kWh in 2022,as well as for bioenergy projects,at USD 0.061/kWh(IRENA,2023b).It is equally important to consider the wider economic and environmental benefits of renewable power in reducing fossil fuel imports,improving a countrys balance of payments and enhancing security of affordable ener
118、gy supply by reducing exposure to volatile fossil fuel prices in global markets.2 As 2022 showed,the indirect economic benefits of this enhanced energy security can be significant;yet they are typically not valued in current policy.fokke baarssen/shutterstock26TRIPLING RENEWABLE POWER AND DOUBLING E
119、NERGY EFFICIENCY BY 2030 FIGURE 4 Investments required to meet the 1.5C goal2023-2030Renewable powergeneration capacityMarineGeothermalCSPBioenergyHydro(excl.pumped)Wind offshoreWind onshoreSolar PVTotalBuildingsIndustryTransport4044096567381 0241 3692 8672 94310 410Cumulative investments neededAll
120、numbers 2021 USD billionEnergy efficiency Energy conservation+1.56 8016 2261 02320014 2402030USD blnUSD blnGrids and flexibility4 840USD bln29 490USD blnSource:(IRENA,2023a).27 CRUCIAL STEPS TOWARDS 1.5C Similarly,the economic benefits of reducing pollution,and thereby improving climate,environmenta
121、l and health outcomes,are almost never properly valued in policy-setting(IRENA,2023b).These unpriced benefits significantly improve the competitiveness of renewable power and make the business case for accelerated deployment even more compelling.Under IRENAs 1.5C Scenario,the power systems of tomorr
122、ow would integrate a broad range of renewable sources,with each technology playing a key role in meeting electricity demand;but solar and wind power will dominate capacity expansion.This represents a transformative shift in power system supply dynamics and poses new challenges to power system operat
123、ions.These may be met by adopting new operational strategies and mechanisms,accelerating the scale-up of smart demand response schemes and deploying technologies that support power system flexibility,including hydropower with reservoirs and pumped storage;energy storage;and sector coupling technolog
124、ies.In recent years,hydrogen produced from renewable electricity known as green hydrogen and its derivatives have been identified as industrial feedstocks for decarbonising hard-to-abate sectors.Hydrogen has also been recognised as an energy carrier that can be used to balance electricity demand wit
125、h supply from variable renewable energy,thereby providing the increasing flexibility required by grids.Scaling up green hydrogen therefore offers significant potential for integrating higher shares of renewable energy in grids,and can also provide a solution for seasonal energy storage.FOTOGRIN/shut
126、terstock metamorworks/shutterstock28TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 ENERGY EFFICIENCY2xA rapid scale-up in renewables is only part of the energy transition equation.The transition should also aim to deliver reduced energy intensity across the economy through a range o
127、f more energy efficient technologies,complemented by structural and behavioural changes.These measures can often generate economic and environmental co-benefits.A range of measures will be needed across all end-use sectors,including modal shifts from private passenger cars to collective transport,an
128、d from passenger aviation and road-based freight to rail,as well as the adoption of circular economy principles,improved building insulation,heat pumps and efficient electric motors especially for industrial end-use sectors.Energy efficiency(measured in terms of energy intensity improvement rates3)i
129、n IRENAs 1.5C Scenario is largely a result of a combination of efficient technologies in end-use sectors and extensive electrification.The electrification of end-use sectors such as in transport and buildings would see a rise in direct use of electricity in total final energy consumption from 22%in
130、2020 to 29%in 2030.Technical energy efficiency improvements embodied by heat pumps,more efficient appliances and electric vehicles together with flexible,smart electrification strategies and deployment of decentralised energy are of tremendous importance in decarbonising end-use sectors such as buil
131、dings and transportation.For industrial sectors,continued energy efficiency improvements play an important role in keeping the overall energy consumption by industry close to unchanged in 2050 from present levels(IRENA,2023a).To align with IRENAs 1.5C Scenario,the global annual rate of energy intens
132、ity improvement should double by 2030 from the current level,which is also in line with the assessment of the International Energy Agency(IEA,2023).If this rate is achieved,global final energy consumption would experience minimal growth over the same period.With renewables and energy efficiency best
133、 placed to meet climate commitments as well as energy security and energy affordability objectives,governments must redouble their efforts to ensure sufficient investments are made.3)Energy intensity improvement rates are a proxy for energy efficiency improvement rates.The World Energy Transitions O
134、utlook defines energy intensity as total primary energy supply(TPES)divided by GDP;and energy intensity improvement as the compound rate at which energy intensity declines annually at the global level.29 CRUCIAL STEPS TOWARDS 1.5C FIGURE 5 Energy intensity:Indicators in transport and buildings in 20
135、302022TransportBuildingsElectric andplug-in hybridlight passengervehicle stock(million units)Buildingrenovation rate(%of stock per year)359 130 58 1 200 Smart meters(million units)Heat pump installations(million units)Heat pump installed capacity(GW)447 1159 10 1%2%8937 2030Based on:(IRENA,2023a).Ol
136、ga_Ionina/shutterstock30TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 ENERGY TRANSITION ENABLERS AND POLICY PRIORITIES Agnieszka Swierczek/unsplash31 CRUCIAL STEPS TOWARDS 1.5C INFRASTRUCTURE AND SYSTEM OPERATIONWind and solar power are the fastest growing sources of power worldwid
137、e,but there is also a need to accommodate a more diverse range of renewable energy sources in the power mix including hydropower with reservoir storage and biomass-based power plants.This will require enhancements to and expansion of current power grid systems,and the modernisation and upgrading of
138、power system operations.With VRE sources becoming the major source of power in a 1.5C-compatible world,countries must start upgrading and expanding their power grid infrastructure to prepare for increasing end-use sector electrification.Multiple measures are required,including:Innovative power plann
139、ing,grid expansion,modernisation and enhancement,and addressing interconnection backlogs(projects awaiting connection to the grid).Changes in grid operation and management,potentially also including new market design.Increased interconnectors between countries and regions.Growth in electricity stora
140、ge;comprising short-duration storage for increasing grid flexibility and long-duration storage to enhance energy security(e.g.pumped storage).Measures to allow greater integration of demand-side management and behind-the-meter(consumer)flexibility options(e.g.distributed storage).Introducing other f
141、lexibility sources(e.g.green hydrogen,hybrid renewable parks combining wind/solar/storage,etc.).32TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 FIGURE 6 TRIPLING RENEWABLE POWER&DOUBLING ENERGY EFFICIENCY INFRASTRUCTUREAND SYSTEMOPERATIONPOLICY ANDREGULATIONINTERNATIONALCOLLABORATI
142、ONSUPPLY CHAINS,SKILLS AND CAPACITIES11 000 GW x2PATHWAY TORENEWABLE POWERENERGYEFFICIENCY72105 in GWFINANCE Energy efficiency standards/phase-out of inefficient equipment Fiscal,financial and regulatory measures to incentivise deployment Socio-economic and environmental policies Cross-sectorinfrast
143、ructure planning Grid modernisationand expansion Supply-side flexibility and demand-side management Increased public and private financing Access to low-cost financing in thedeveloping worldAnnual rate of energy intensity improvement Resilient supply chain and responsible procurement Education and t
144、raining;re-skilling and up-skilling Empowering women and under-represented groups Collaboration on sustainability,governance,climate finance,supply chains,technology,innovation and regional power gridsMarineGeothermalWind onshore197CSP1465Hydro343BioenergyKEY ENABLERS:+1.53040Wind offshore494Solar P
145、V5457203033 CRUCIAL STEPS TOWARDS 1.5C Power gridsInvestments in the electricity grid have lagged behind those in renewable power and must now significantly ramp up in anticipation of the considerable renewable power additions required.Countries need to prepare for the large amounts of VRE that will
146、 come online in the next few decades,as grid investments must be made 3-5 years before renewable energy investments to mitigate the overall system costs of greater renewable penetration(LBNL,2022).4 With clarity on grid infrastructure development plans and reasonable guarantees on connection availab
147、ility,investors will feel more confident building new generation;meanwhile,consumers would be more likely to invest in electrification when a reliable supply of low-cost electricity can be made available.When integrating higher shares of locally available variable solar and wind power,power systems
148、will also need to innovate to become:increasingly decentralised,allowing electricity to be generated at locations closer to demand;and bi-directional,allowing electricity from distributed power generating facilities to be injected into the grid.Modernised,smarter grids are required;in the European U
149、nion(EU),around 30%of the envisaged investment in grids by 2030 could be earmarked for digitalisation5(European Commission,2022).They will also need to be larger and more robust.Hence,grid costs are expected to increase over time(IRENA,2023a).This will require fast-tracked permitting to ensure timel
150、y investments in modern grids.Adding more widely distributed power generation sources will also bring resilience,especially against increasingly intense extreme weather events owing to climate change(IPCC,2023).The electrification of transport also requires significant investments in enabling infras
151、tructure.Electric vehicles will potentially account for more than 80%of all road transport activity by 2050;with 359million electric and plug-in hybrid light passenger vehicles worldwide by 2030 and 2182million by 2050(IRENA,2023a);yet their market entry will be contingent upon co-ordinated investme
152、nts in charging infrastructure and power grids.4)In some countries,renewable energy projects wait several years for an interconnection agreement from the grid authority,due to a backlog of project applications and insufficient capacity.In the United States,for example,the average time from interconn
153、ection request to a project reaching commercial operations is more than four years(LBNL,2022).5)Digitalisation is a key amplifier of power sector transformation,enabling the management of large amounts of data and optimising increasingly complex systems.For the power sector,digitalisation helps to i
154、mprove monitoring,operation and maintenance of assets using technologies such as the internet of things(IoT),artificial intelligence and blockchain(IRENA,2019).URGENT RECOMMENDATIONS FOR POLICY MAKERS Ensure planning,timelines and assessments of investment needs for grids are aligned with long-term
155、targets for renewable energy buildout and end-use sector decarbonisation,e.g.transport.Mobilise funds for long-term grid investment;channel donor finance to building capacity and infrastructure for integrating renewables;and streamline permitting procedures for new grid infrastructure and upgrades t
156、o existing transmission and distribution infrastructure.Develop modernised,decentralised(where suitable)and more resilient grid systems using digitalisation,smart applications for demand-side management and interconnections with neighbouring grid systems.34TRIPLING RENEWABLE POWER AND DOUBLING ENERG
157、Y EFFICIENCY BY 2030 Energy storageWith a growing share of variable renewable power generation,energy storage is needed to ensure the electricity generated is successfully delivered when shortfalls between supply and demand occur.Historically,this has been provided by pumped storage and hydropower w
158、ith reservoirs.However,there are now many types of storage,including electro-chemical storage(batteries),thermal energy storage(which employs rocks,bricks or molten salts to store heat),mechanical technologies(employing compressed air,liquid air or gravitational potential)and chemical storage(storin
159、g energy in chemical bonds such as hydrogen or its derivatives).All of these technologies are undergoing rapid innovation.LONG DURATIONENERGY STORAGEStore gravitational potential or kineticenergy MechanicalStore energy inchemical bonds(e.g.H2,power-to-gas-to-power)ChemicalStore energy thermally tore
160、lease heat ThermalStore electrical potential energy in batteries of different chemistriesElectrochemicalFIGURE 7:Long duration energy storage technologiesBased on:(LDES Council and McKinsey&Co.,2021).Fly_and_Dive/shutterstock35 CRUCIAL STEPS TOWARDS 1.5C Long-duration energy storage(LDES)provides th
161、e means to store energy for hours,6 days,weeks or even seasons when renewable generation is abundant relative to load,and releasing it when demand is greater than generation(e.g.saving energy from spring days with low loads and abundant solar to deploy during high load days in the summer;or from win
162、dy autumn days to deploy during high load cloudy winter days).Diverse storage technologies enhance the resilience of grids that are subject to extreme weather for prolonged periods,help relieve grid congestion,provide transmission services and shore up local area reliability.LDES,including storage t
163、echnologies spanning 10+,24+,100+and 150+hours in duration and providing both power and heat,is also able to provide other grid services including black start(restarting parts of the grid where power has been lost in a blackout)and micro-grid level assistance for areas or key infrastructure that may
164、 lose power.Storage durations can span weeks or months in the case of pumped storage and reservoir hydropower.As the largest form of installed flexibility at over 175 GW worldwide,pumped storage hydropower can play an important role in providing LDES and vital grid services,with substantial potentia
165、l for off-river pumped storage to be developed in the coming decades(IHA,2023).Some LDES technologies are commercially available today,while others are still in the early stages of development.Numerous companies are signing contracts(e.g.with utilities,airports,data centres,industrial users,etc.)and
166、 are deploying LDES at grid-scale quantities,and pumped storage has been successfully deployed for decades.One emerging LDES technology is hydrogen storage.Hydrogens true competitive strength lies in its unique ability to store energy for long periods of time in large quantities.As green hydrogen di
167、splaces fossil fuels in some end uses,hydrogen storage could become increasingly critical to energy security,in the same way that natural gas storage is today in many regions.Hydrogen storage will be needed primarily to meet variation in supply(rather than demand),as green hydrogen is created using
168、VRE sources.Long-term hydrogen storage can play an important role in strengthening energy security and system resilience(IRENA,2023d).Support for the continued development of these technologies is critical for decarbonisation.In many places,however,legacy market arrangements and policy frameworks do
169、 not incentivise investment in storage at scale.Action from policy makers can drive progress in this sector,such as:assessing energy storage and flexibility needs;setting LDES mandates for medium-and long-term capacity targets;updating criteria for marketplaces;providing innovation grants and subsid
170、ies for pre-feasibility studies;and establishing public-private partnerships.Other market innovations can also foster a healthy storage market,such as the introduction of congestion management trading platforms,ancillary services markets to support the grid,and awarding additional value for features
171、 such as flexibility in capacity payments and capability to provide peaking power(e.g.storage technologies that can replace a natural gas peaking plant should be reflected in system modelling).6)Typically more than ten hours,while the benchmark for lithium-ion batteries is four.36TRIPLING RENEWABLE
172、POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 End-use electrification and sector couplingWith solar and wind power scaling up rapidly in this decade,electrification has become a vital decarbonisation pathway.Green hydrogen and its derivatives,produced by electrolysers using low-cost renewable power,c
173、an be used to decarbonise end-use sectors that are difficult to electrify directly such as iron and steel making,and shipping and to provide seasonal energy storage solutions.However,electrification needs to be accelerated by systemic innovation,making it not only faster but smarter.Smart electrific
174、ation through sector coupling and enhanced flexibility prevents a higher peak electricity load on the power system.It also enables the power system to accommodate new loads while allowing integration of a higher share of variable renewable electricity in a cost-efficient manner.This can help sustain
175、 renewables-based electrification without jeopardising energy system operation,thus making the power system robust and resilient.To harness all these benefits,systemic innovation should involve the entire energy value chain across four key dimensions:technology and infrastructure;market design and r
176、egulation;system planning and operation;and business models(IRENA,2023d).Smart charging for electric vehicles is a good example in this regard.Sector coupling(integrating electricity grids,transport systems,heating in buildings and thermal energy grids)provides more opportunities to economically opt
177、imise overall operation as a single system,provided that the economic incentives are put in place and upgraded energy management systems are available(IRENA Coalition for Action,2022).The benefit of this will be smarter,more intelligent demand-side management,achieved by deploying more advanced digi
178、tal technologies both behind-the-meter(by energy consumers)and in power systems.Demand response would become more agile and inter-operational through sector-coupled technologies such as energy storage systems and electric vehicles(EVs)connected to smart charging facilities.This would enable increase
179、d integration of variable renewable electricity in local energy networks and maximise overall benefits by automating the monitoring and operation of assets(IRENA,2021a;IRENA Coalition for Action,2022).URGENT RECOMMENDATIONS FOR POLICY MAKERS Conduct technical assessments of system decarbonisation ne
180、eds and timelines,and ensure the planned buildout of renewables is complemented by storage resources of varying duration,as well as other sources of flexibility.Collaborate with regulators and the renewables sector to enhance power market planning and ensure price signals,clear targets and procureme
181、nt incentivise longer duration storage.Encourage investment and innovation in diverse storage technologies to suit different users,such as by establishing research,development and innovation(RDI)grant programmes,encouraging publicprivate partnerships and setting medium-and long-term capacity targets
182、.37 CRUCIAL STEPS TOWARDS 1.5C End-use electrification,sector-coupling and the rapid scale-up of variable renewable electricity all require integrated cross-sectoral infrastructure planning a process for optimising the co-development of increasingly connected infrastructure in various sectors.7 The
183、European Hotmaps project offers an open-source toolbox to support public authorities,energy agencies and urban planners as they plan heating and cooling at local,regional and national levels.It allows users to map cooling and heating demand,as well as supply,in the 27 EU Member States and the United
184、 Kingdom,and provides renewable energy generation and industrial waste heat potentials(Hotmaps,2021).This facilitates the integration of heating and cooling with waste-to-energy and renewable energy,including power-to-heat.However,this planning approach requires incentives for infrastructure investm
185、ents where market barriers exist,given that different infrastructures operate under different legislative,regulatory and policy regimes.URGENT RECOMMENDATIONS FOR POLICY MAKERS Adopt a sector-coupling approach to the decarbonisation of economies by pursuing smart electrification of the transport,bui
186、ldings and industry sectors.Create fora for co-ordinated planning among relevant authorities on infrastructure development,including renewable energy projects,grid and transmission assets,electric vehicle charging infrastructure and heat networks.Introduce economic incentives for smart electrificati
187、on and demand-side response(such as tax credits and innovation grants)to encourage private investment in sector-coupling solutions.7)For example,power grids,electric vehicle charging infrastructure and power-to-heat solutions at small and large scales,including thermal networks,all linked to optimis
188、e variable renewable electricity.Have a nice day Photo/shutterstock klikkipetra/shutterstock38TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 Demand-side managementElectricity systems are complex;in addition to the grid infrastructure planning required to unlock the benefits of secto
189、r coupling,distributed grid planning and operations will need well-defined energy management schemes on both sides of the end-user meter.These schemes apply to both the supply side(power management)and demand side(load management).Demand-side management(DSM)comprises a set of strategies traditionall
190、y aimed at reducing peak demand,which will be increasingly needed to incentivise consumption in periods of high VRE generation.DSM addresses various challenges,including VRE integration,rising electricity costs and environmental impacts.For example,DSM can employ time-of-use pricing to encourage cus
191、tomers to shift electricity usage to off-peak hours,while demand response programmes can financially reward customers for reducing electricity usage during peak hours or consuming electricity during high VRE generation periods.Critical-peak pricing,real-time pricing and critical-peak rebates are als
192、o among the strategies available.These approaches are crucial for optimising energy efficiency in both residential and industrial buildings.As the transition advances,DSM will also provide flexibility to alleviate the need for more costly requirements.Several challenges persist,however particularly
193、in Latin America,the Middle East and North Africa,and other Global South regions.Notable issues include physical grid and digital technology infrastructure gaps,as well as complex and inconsistent regulations and policies.Financing challenges also hinder progress;attracting investment in clean energ
194、y enablers like DSM solutions requires innovative financing models and incentives.Intelligent load control,demand response and energy efficiency are pivotal in enabling a secure and resilient renewables-based power system.Continued investment and innovation in these areas will further drive the adap
195、tation of demand to supply in a renewable energy-driven future.URGENT RECOMMENDATIONS FOR POLICY MAKERS Assess the cost-benefit of investment in DSM programmes,accounting for the energy and cost savings it can provide instead of investing in grid infrastructure expansion.Ensure grid planning priorit
196、ises modernisation and DSM technology to close critical technology gaps as infrastructure expands.Developing economies can explore innovative financing models such as blended finance to mobilise investment in grid and DSM solutions.Improve data availability within the wider electricity system to ena
197、ble innovation in DSM and access to applications like smart meters by consumers and third parties.39 CRUCIAL STEPS TOWARDS 1.5C POLICY AND REGULATIONGovernments have a crucial role to play in tripling renewable power capacity and placing the world on a 1.5C pathway.All too often,the energy transitio
198、n discourse relegates governments responsibilities to creating an enabling environment for private investments through predictable and stable policies,and the creation of instruments that de-risk investment projects.Although this is crucial,a much broader and more integrated policy approach is requi
199、red to facilitate the adoption of an entire spectrum of energy transition solutions needed to achieve the 1.5C target and unlock its socio-economic benefits(Figure 8).Governments need to be far more engaged in shaping and guiding the energy transition,including through policies for ambitious public
200、investment programmes and sufficient forward-planning for renewables scale-up,system integration and grid build-out.Cross-cutting approaches covering all renewable technologies,electrification technologies and others are needed to facilitate the energy transition(e.g.energy storage),include enabling
201、 policies that set ambitions and send clear signals to stakeholders,eliminate distortions,incentivise the uptake of solutions and facilitate access to affordable financing.They also include policies that ensure the integration of renewables within energy systems,economies,nature and societies,as wel
202、l as specific deployment policies for various technologies.Planning for transmission infrastructure,inter-regional power trading,workforce recruitment and training,flexibility services and end-use sector decarbonisation should all be aligned with overall climate and renewable energy targets to ensur
203、e renewable power can be efficiently integrated and dispatched to areas of demand.Transitioning to a renewables-based economy may also bring challenges in the form of financing gaps,labour market disruptions and energy sector insecurity.These misalignments,if not well-managed,risk inequitable outcom
204、es and a slower pace of the energy transition.Therefore,a set of structural and just transition policies,along with the creation of strong institutions to ensure policy co-ordination and cohesion,is required to manage potential misalignments.Finally,a holistic global policy framework that entails in
205、ternational collaboration including North-South and South-South co-operation is needed to bring stakeholders from countries around the world together to commit to a just transition that leaves no one behind and strengthens international finance flows,capacities and technologies in an equitable manne
206、r.This section focuses on the key policies and regulations needed to accelerate energy efficiency and renewable power technologies;phase down fossil fuel generation and replace inefficient equipment;shape power market design to integrate higher shares of renewables;and maximise social and environmen
207、tal benefits.TODAYx3x2RenewablepowerEnergyefficiencyIdee 01a20302030203040TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 FIGURE 8 The IRENA holistic policy framework for a just and inclusive energy transitionBased on:(IRENA,2021b).DEPLOYMENTPOLICIESINTEGRATINGPOLICIESENABLINGPOLICIE
208、SSTRUCTURALCHANGE ANDJUST TRANSITIONPOLICIESHOLISTICGLOBAL POLICYFRAMEWORKECONOMYENERGYSOCIETYPLANETPLANETENERGYECONOMY20302030 ABCDstock/shutterstock41 CRUCIAL STEPS TOWARDS 1.5C Improving energy efficiencyImproving energy efficiency could deliver around a quarter of the emissions reductions needed
209、 by 2050,according to IRENAs 1.5C Scenario.Enhanced energy efficiency is a crucial enabler for making high levels of end-use electrification feasible and affordable.Measures related to reducing energy demand and improving efficiency are needed across all end-use sectors.Minimum energy performance st
210、andards(MEPS)can support industrial,commercial and residential users to procure and switch to more energy efficient appliances or equipment such as electric heating/cooling technologies.Building codes can set energy performance requirements by specifying insulation standards,thereby reducing heating
211、 and cooling demands.They can also specify greenhouse gas emission targets and carbon footprints.For renovation,in particular,codes can be coupled with financial incentives.It is also important to address prevailing challenges associated with building ownership structures,equitable access and benefi
212、t-sharing of energy efficiency investments and policies.“Green loans”could carry lower interest rates and protect low-income energy consumers from energy price fluctuations and inflationary environments.Awareness campaigns for end-users also play an important role in the adoption of energy efficienc
213、y and energy conservation measures.In the transport sector,significant improvements can be achieved by promoting energy efficient mobility(e.g.public transport such as railways,metros and buses,and car-sharing),as well as active(non-motorised)transport such as cycling and walking in urban areas.Publ
214、ic campaigns can be undertaken by national and local governments to encourage green mobility modes.Other policies,such as differentiated parking fees and highway tolls,can encourage a shift to public transport,complemented by dedicated driving lanes for car-sharing.Public transportation fleets also
215、offer the opportunity to utilise cost-competitive renewable fuels or electricity.URGENT RECOMMENDATIONS FOR POLICY MAKERS Adopt ambitious targets for energy efficiency improvement with specific time horizons and outline clear avenues for implementation.Strengthen regulatory frameworks,including buil
216、ding codes that specify low energy performance and appliance energy efficiency standards.Expand the availability of financial incentives and affordable lending schemes for meeting standards on energy efficiency,such as tax credits or green loans with favourable interest rates for building renovation
217、 or modernisation.Establish public campaigns to build awareness of the role of energy efficiency measures,public transport and green mobility for cost savings and collective decarbonisation goals.42TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 Market incentives and fiscal policyWhi
218、le renewables have become increasingly competitive,they still face barriers compared to fossil fuels.Rising fossil fuel prices have acted as an important catalyst for energy efficiency measures;yet,energy efficiency improvements and renewables deployment still face financial and other obstacles,such
219、 as access to capital or long pay-back periods.Fiscal and regulatory incentives therefore play an important role in accelerating the deployment of both renewable energy and energy efficiency measures.A progressive,supportive fiscal system can be achieved by eliminating market structures that favour
220、the uptake of fossil fuels(e.g.phasing out direct and indirect fossil fuel subsidies)and reflecting environmental and social costs associated with the use of fossil fuels through taxation or other mechanisms.Such policies would improve the economic competitiveness of renewable energy and energy effi
221、ciency solutions.Taxes and levies,subsidies or exemptions on duties for imported/exported components required by the renewables sector could kickstart private investment in renewables projects and manufacturing activity.Countries with fiscal restraints can benefit from donor finance to support build
222、ing capacity and physical infrastructure for the integration of renewable power,among other important aspects that would assist those countries in advancing the energy transition.The energy transition will only succeed if it is both deep and broad.Therefore,careful consideration of broader social an
223、d equity issues is also vital,particularly for low-income populations for whom energy constitutes a larger share of household expenditure.Financial support drawn from general taxation,tax on windfall profits and ongoing taxation of fossil fuel energy production and carbon pricing revenue can all be
224、used to support the transition.Regulatory policies,such as tariff-based procurement mechanisms e.g.feed-in tariffs or auction schemes using a contracts for difference(CfD)mechanism,which provide stable prices over long periods are also effective.The choice of instrument and its design should conside
225、r:the nature of the solution(e.g.utility-scale,distributed,off-grid);level of development of the sector;power system organisational structure;wider macroeconomic environment(e.g.impact of inflation and commodity price volatility);and broader policy objectives.It is important that price levels for pu
226、blic procurement schemes and competitive auctions in particular balance cost-efficient electricity supply to consumers with healthy,sustainable supply chain development for the renewables sector.However,any trade-offs in these areas must carefully consider the risk of non-delivery,given the very tig
227、ht timeline to achieve the renewable power and energy efficiency targets for 2030.PBR Images-Peter B Ryan/shutterstock43 CRUCIAL STEPS TOWARDS 1.5C Private investments will continue to play a major role in the energy transition.As such,it is vital that policy makers ensure a policy and regulatory en
228、vironment that de-risks investments and unlocks private capital flows to the renewables sector.Key factors include setting clear and ambitious capacity targets with a rolling schedule for procurement,as well as ensuring large volumes of land/seabed are made available where under government control f
229、or renewables development,and that permitting and environmental processes are efficient and streamlined(see below).This will help to provide predictability for investors,developers and supply chain actors,while enabling public authorities to efficiently plan for grid integration,workforce developmen
230、t and demand-side management.Where procurement is facilitated by CfDs,power purchase agreements(PPAs)or other mechanisms,these should meet international standards for bankability in terms of their coverage of dispute mechanisms,grid connection delays and curtailment risk.A mechanism to allow for bil
231、ateral power procurement between generators and private off-takers(such as industrial actors or corporates)can further strengthen the case for large deployment volumes.URGENT RECOMMENDATIONS FOR POLICY MAKERS Ensure fiscal policy prioritises equity in the energy transition,for instance by investing
232、proceeds from taxes on fossil fuel energy production and carbon pricing mechanisms in enabling infrastructure,or supplementing clean electricity access for low-income populations via green financing schemes and other instruments.Introduce tax credits,levies and/or exemptions on import/export duties
233、for key materials and components in the renewable energy supply chain.Ensure procurement schemes,including tenders,provide adequate price signals for investment and balance long-term price/cost risk mitigation with socio-economic value creation,thereby providing cost-efficient electricity,and enabli
234、ng forward-planning and investment in renewable energy supply chains.Consider the trade-offs between lowest-price objectives,and other policy outcomes such as socio-economic development,system integration and industry sustainability.Martin M303/shutterstock44TRIPLING RENEWABLE POWER AND DOUBLING ENE
235、RGY EFFICIENCY BY 2030 Power market design and regulationThe world is entering a new era in which electricity systems will be increasingly dominated by zero-marginal-cost renewable technologies.Power markets must evolve and adapt to new market forces,such as corporate and industrial demand,and behin
236、d-the-meter(prosumer)generation.They must be organised in a way that incentivises new investment in renewable power generation and the flexibility to provide reliable electricity at a level required for the 1.5C pathway.This requires governments and other stakeholders to undertake a close examinatio
237、n of their power systems organisational structures,i.e.the institutions,processes and arrangements through which electricity services are exchanged and rewarded.Wholesale power markets today are based on marginal cost pricing,where the most expensive generator(with the highest variable cost typicall
238、y fossil fuel-fired plants)determines electricity prices for the time period in which the market operates.This poses a number of challenges.As the share of renewable power grows,wholesale spot markets will see increased price volatility,as periods of high renewable power generation push clearing pri
239、ces in the wholesale market close to zero.When renewable generation is less than demand,flexibility resources will be needed,potentially resulting in very high prices at certain times.If wholesale markets are the main source of revenue,the economic feasibility of new investments will plummet,as even
240、 existing generators will struggle to recover their initial capital costs whilst prospective investors realise diminishing returns.The paradigm that relies on free markets to incentivise power supply investment decisions therefore needs to change.Ultimately,a renewables-based power system requires e
241、nhanced flexibility;wholesale market design must deliver this as well as providing the volume of renewable power needed.Policy makers must therefore urgently create the enabling conditions for power grid and system flexibility to integrate increasing shares of wind,solar and other forms of renewable
242、 energy.Power system organisational structures must evolve to better align with energy policy and decarbonisation goals.A“dual procurement”power market design could introduce long-term contract mechanisms(e.g.Auctions,CfDs,PPAs)as the backbone of renewable power procurement,alongside a short-term ma
243、rket to dispatch flexible resources in an affordable way(IRENA,2022a).This holistic model would incentivise continued investment in large-scale,capital-intensive renewable energy projects,while assuring the flexibility needed for a resilient and reliable renewables-based power system.This transforma
244、tion is partially underway,as auctions are becoming the preferred tool to procure renewable energy,and wholesale markets are becoming more time and location granular(IRENA,2023a);but there are meaningful actions authorities can take now to ensure the acceleration of this trend.One way to achieve enh
245、anced system flexibility is for power markets to allow flexibility technologies(such as batteries and pumped hydropower)to provide ancillary services and be rewarded accordingly.Ancillary services that serve to stabilise the grid network and will become increasingly important as dispatchable fossil
246、fuel-based generation is phased out of the power mix.Today,many power systems reward the provision of energy but not ancillary services(where these services are not included in contractual obligations).They therefore need to be appropriately valued and reflected in power system design.Valuing,pricin
247、g and procuring ancillary services astutely can bring new players to the grid,with advantages for the whole power system.Examples of this include the enhanced frequency regulation auctions in the UK.45 CRUCIAL STEPS TOWARDS 1.5C To achieve the energy transition,individuals,communities and businesses
248、 will also need to become active participants in the energy system.This includes growth in distributed renewable energy generation systems notably using solar PV but also community solar and wind projects.This will require electrical grids that allow energy consumers to easily install and utilise sm
249、all-to mid-scale renewable energy projects to cover their consumption,and/or inject power into the grid through connection schemes like net-metering and feed-in-tariffs.Such measures can maximise the socio-economic benefits of renewable energy,insulate consumers from price volatility,create local su
250、pply chains and job opportunities,and enhance public perceptions of renewables.URGENT RECOMMENDATIONS FOR POLICY MAKERS Ensure price signals encourage sufficient investment in additional renewable capacity to meet climate and energy transition targets;and adopt renewable power procurement approaches
251、 that recognise the net benefits and costs of social,environmental,system integration and energy security factors.Design auctions that balance competitive price discovery and long-term delivery of affordable electricity.Auctions should also be run for sufficiently large and ambitious volumes,with co
252、nsistent,transparent tendering schedules to effectively foster competitive bidding.Create a capacity market for flexibility services(including ancillary services and storage capacities of varying duration)with a long time horizon aligned to targeted renewable energy penetration of the power mix.Reth
253、ink participation rules to allow new technologies to engage in the power market as flexibility providers,including storage and demand side aggregators.Encourage investment in distributed renewable energy systems that allow consumers to become“prosumers”by both using and producing clean electricity.R
254、eorganise power market structures to ensure policies for accelerating renewables deployment account for system flexibility as well as sustainable returns to generators and investors.2030 m_bumbik/shutterstock46TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 Streamlining permittingThe
255、 time and cost constraints imposed by permitting procedures represent a major bottleneck impacting the deployment of renewable energy projects in many countries.It is essential that permitting procedures are fit-for-purpose and keep pace with renewable and climate targets,without compromising enviro
256、nmental and social impact standards.Experiences from the public and private sectors indicate that best practices in permitting centre on four areas:administrative consolidation;digitalisation;policy support;and public engagement(European Commission,2023).Renewable energy developers often need to con
257、sult numerous authorities at national,sub-national and sometimes village or prefecture level for the necessary permits to build a project.This process can be lengthy and extremely bureaucratic;for instance,the global average time required for permitting an offshore wind project is nine years.Onshore
258、 wind and utility-scale PV permitting processes can also be long,although they are typically shorter than those for offshore wind.Similar obstacles exist for hydropower projects and smaller scale distributed projects for end consumers using renewable energy technologies like rooftop solar.Creating d
259、edicated,centralised authorities is one way to streamline this process by ensuring developers can refer to a single focal point.Countries like Denmark and the Philippines have already adopted a“one-stop shop”model to accelerate renewables deployment,but this model only works if it is adequately reso
260、urced.In addition,digitalised processes to submit and track applications would enable developments to progress more efficiently,while access to digitised local consenting and historical dispute records would allow developers and authorities to screen sites that could be high-risk or unsuitable at an
261、 early stage(IRENA,2023h).An overarching best practice is the introduction of legislation mandating a maximum lead time for the permitting of renewable energy projects.Revisions to the EU Renewable Energy Directive in 2023,for instance,set a maximum two-year lead time for permitting new renewables p
262、rojects,and one year for repowering(refurbishing or replacing)wind and solar projects.Gaining social acceptance through public engagement with relevant stakeholders is critical in the consenting and constructing stages of a renewable energy project.This includes early and continuous consultation by
263、authorities and developers with local communities to communicate the benefits and considerations brought by a project to the area,as well as a transparent conflict resolution mechanism that sincerely addresses community concerns.Comprehensive and efficient permitting frameworks represent a clear win
264、-win,allowing renewable energy development to expand this decade while cultivating acceptance with other interests in land and sea spaces.The Planning for Climate Commission has produced a nine-point plan for tackling climate change through fast and fair permitting for renewable energy and green hyd
265、rogen that provides best practices and can be consulted by policy makers worldwide(GHO,2023).Recent studies indicate that adopting best practices in permitting could cut consenting time for utility-scale wind and solar projects by more than half;for example,onshore wind farms could be permitted in o
266、ne year,offshore wind farms in 1.5years and solar farms in as little as three months(ETC,2023).This makes permitting a high-impact enabler for the energy transition,where the necessary investment in resource,policy support and capacity will bring enormous value to countries in accelerating renewable
267、s growth and securing associated socio-economic and environmental benefits.47 CRUCIAL STEPS TOWARDS 1.5C URGENT RECOMMENDATIONS FOR POLICY MAKERS Create a centralised authority to oversee permitting of renewables projects,consolidating information and requirements from all relevant authorities and i
268、ssuing permits according to a transparent timeline.Mandate and enforce maximum lead times for applicants and authorities to complete the permitting stages of renewable energy projects,with discretionary additional time under exceptional circumstances for more complex projects.Allocate greater resour
269、ces to permitting authorities,including human resources and investment in digitalisation and open-source databases,such as for land titles,mapping data and historical dispute records.Consider adopting efficient legal challenge processes by implementing a limited time window for raising disputes and
270、establishing an authority to screen challenges,balancing public interests.Expedite processes for developers repowering assets on existing sites and provide the flexibility to adjust a proposed infrastructural,technological or social approach to projects without having to reapply for new permits.Redu
271、cing negative impacts;maximising social and environmental benefitsScaling up renewable energy deployment provides an opportunity to create widespread socio-economic benefits for communities around the world,including energy access,job creation,public health improvements and welfare generation.Renewa
272、ble energy employment worldwide grew to an estimated 13.7million direct and indirect jobs in 2022(IRENA and ILO,2023);under the 1.5C pathway,tens of millions of additional jobs could be generated worldwide by 2030(IRENA Coalition for Action,2023).The energy transition will bring benefits to any econ
273、omy,but also challenges in the form of misalignments that may occur in finance,the labour force and the energy sector itself.If not well managed,these misalignments risk inequitable outcomes,which could sow doubt among policy makers and the public concerning the advantages of the transition and lead
274、 to a fractured and unco-ordinated policy environment.Hence,there is a need for policies and measures that equitably distribute the benefits of the energy transition and raise public awareness about these positive impacts.In terms of jobs,sectoral misalignments may arise due to potential shifts in v
275、alue and supply chains during the energy transition.For instance,transitioning from fossil fuel power generation to solar energy may shift the focus from fuel extraction to the semi-conductor industry.The impact on employment depends on factors such as domestic production and labour productivity.Lab
276、our-market interventions encompass adequate employment services attuned to evolving circumstances and needs,along with measures to facilitate labour mobility(IRENA and ILO,2023).Community benefit schemes span countries from Costa Rica to Mali and adopt a range of structures,from shared ownership of
277、renewable assets to industry sponsorship of critical social and economic infrastructure in host communities(IRENA Coalition for Action,2020).Under the right conditions and policies,citizen and community participation in renewable energy projects can accelerate deployment while boosting support for l
278、ocal energy transitions.48TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 Aligning policies and measures with the principles of a just and equitable transition will facilitate local value creation and socio-economic benefits in host communities,and on a larger scale,ensure political
279、and social stability as renewable energy expands.As part of a sensitive and efficient permitting framework,renewable development must be well integrated with the principles of sustainability,circular economy and reduced environmental impact particularly on land use and biodiversity.This also applies
280、 to enabling infrastructure,with grid expansion into remote and biodiverse areas requiring careful siting.Adopting sustainable end-of-life management policies,including waste management legislation,can help countries prepare for the anticipated volumes of equipment waste such as solar PV panels and
281、batteries.Research and development programmes across the energy and waste sectors,and industrial clusters,can help to further scale waste management infrastructure on a national or regional basis(IRENA and IEA,2016).URGENT RECOMMENDATIONS FOR POLICY MAKERS Align policies and measures with the princi
282、ples of a just and equitable transition and foster local value creation and socio-economic benefits in host communities,with a special focus on the inclusion of marginalised groups.Anticipate labour market disruptions and establish programmes that can address workforce gaps,minimise labour misalignm
283、ents,create opportunities for targeted recruitment and labour mobility,such as relocation grants,and establish social protection programmes.Minimise adverse environmental impacts and encourage nature-positive approaches,for example by incentivising the uptake of sustainability standards for new rene
284、wable energy assets-such as the Hydropower Sustainability Standard-as part of procurement schemes.Ensure the impacts of mining activities and the use of relatively scarce components are mitigated through provisions for circular economy(end-of-life management,recycling and reuse of materials).Gather
285、information on renewables waste production through regular monitoring of waste produced by technology,the composition of waste streams,installed system performance and the causes and frequency of system failures,in order to adopt waste minimisation legislation suitable for the pace and scale of the
286、transition.Faysal06/shutterstock49 CRUCIAL STEPS TOWARDS 1.5C SUPPLY CHAINS,SKILLS AND CAPACITIESBuilding resilient supply chainsThe vulnerabilities of key energy industries to logistics bottlenecks,commodity price volatility,trade barriers,and commodity and component import dependencies have become
287、 increasingly apparent in recent years.Energy supply chains have become a priority agenda for policy makers,as demand and competition for critical raw materials,rare earth elements and production capacity become more acute.Without well-functioning and cost-efficient industrial supply chains,the ener
288、gy transition will not materialise.If not well managed,competition,security and scarcity challenges in renewable energy supply chains could lead to a disorderly transition,characterised by slower rates of renewables deployment at inflated costs.A mismatch between supply and demand for several critic
289、al minerals is already evident,with particularly high levels observed for lithium a key material required for the short-duration energy storage and electric transport sectors(IRENA,2023e).Bottlenecks for key components in the wind industry e.g.nacelles,blades and gearboxes are set to emerge by the s
290、econd half of this decade in Asia and the Americas(GWEC,2023).High concentration risk in the global renewables supply chain also raises the prospect of price or security of supply uncertainty in the future.Robust and resilient global supply chains are required to support a 1.5C pathway.The mining an
291、d processing of critical materials including lithium,copper,nickel and other rare earth metals are constrained within specific geographies,exposing these supply chains to geopolitical tensions and concentration risks(IRENA,2023e).Policy makers should work with the private sector to identify producti
292、on gaps and supply chain weaknesses on a national and regional basis,and generate strategies to reinforce supply chain security.Socially responsible procurement is another key issue,where many critical materials and components refined or manufactured in one country are imported by others for use in
293、the renewables sector.It will be vital to ensure supply chains in the mining and processing segments in particular are managed with respect to fair trade,and high environmental,social governance(ESG)and sustainability standards.Resilient supply chains are also key to sustaining the cost-value propos
294、ition of renewable energy around the world.As countries usher in large industrial policy packages for the energy transition,there is a risk of increasing barriers in the global exchange of renewable energy knowledge,innovation and technology transfer all of which will be essential for a cost-effecti
295、ve and fair transition,particularly for emerging markets and developing economies.The need for local value creation and regional supply chain investment must be carefully balanced with reducing trade barriers for goods and services central to the renewables renewables industry.This will be key to av
296、oid intensifying supply chain bottlenecks and making renewables less cost-competitive,while maximising socio-economic benefits.Multilateral alignment of supply chain,trade and industrial policies for the energy transition will be important in creating unified standards and investment protocols that
297、can channel capital to the renewables sector and nascent green hydrogen sector,and encourage best-in-class development standards.This will require governments to work with industry,civil society and other stakeholders to ensure supply chain planning is conducted through a wider lens that encompasses
298、 national interests,cost-effective and socially responsible sourcing,long-term social and environmental sustainability,and climate and renewable energy targets.50TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 URGENT RECOMMENDATIONS FOR POLICY MAKERS Collaborate with the renewables i
299、ndustry on industrial development reviews and plans for the transition that are sustainable,achievable,and adequately mitigate risk of supply insecurity and price volatility.Approaches include diversifying sources of production,anticipating critical production gaps and localising value chains.Ensure
300、 socially responsible procurement of renewables by encouraging uptake of sustainable supply chain assurance schemes.Incentivise publicprivate partnerships and investment in circularity to encourage reuse of materials and a circular economy approach to project development,which can help to reduce con
301、centration risk and supply insecurity of critical materials.Co-operate with international fora and financial institutions to safeguard international trade corridors for materials and components for key renewable energy technologies.Education,training and capacity-buildingBuilding a skilled energy tr
302、ansition workforce requires measures to both expand the talent pipeline and enhance the quality of education and training provisions.Early exposure to renewable energy topics and careers is vital for sparking interest in pursuing a career in the sector,but also to increase social acceptance by a kno
303、wledgeable citizenry.The curricula at higher education and vocational training institutions must reflect the skills and competences required by the transition.In addition to strengthening the content of education and training programmes,it is also important to enhance the instructional methods used.
304、For example,experiential learning methods where students are encouraged to develop problem-solving strategies can help to prepare learners for jobs in the constantly evolving renewable energy sector,where independent knowledge-seeking will often be necessary.Facilitating collaboration between govern
305、ment agencies on workforce development,industry and educational institutions will contribute to more co-ordinated skill-matching efforts.It is vital to consider how a just transition can respond to potential labour displacement in the existing energy sector workforce and re-skill or upskill appropri
306、ately.Targeted measures to train,recruit and retain women and other underrepresented or marginalised groups(including older workers,ethnic and religious minorities,people with disabilities and those on a low income)will ensure the dividends of the transition are enjoyed by all.This inclusion can be
307、implemented through early exposure to renewable energy leadership and career pathways,targeted scholarships,government-funded training opportunities,and industry apprenticeship and mentorship schemes.Outside the renewables industry,it is equally important to ensure sufficiently skilled and trained w
308、orkers are available in government departments concerned with international trade,supply chains,electric charging infrastructure and land use.Fostering a broader understanding in the public sector of the interconnected nature of the energy transition,and the cascade effect of decarbonisation opportu
309、nities brought by a ramp-up of renewable electricity,can help to avoid knowledge silos and create more co-ordinated policy across different pillars of government.51 CRUCIAL STEPS TOWARDS 1.5C Carefully designed public-private partnerships(PPPs)can also play a crucial role in improving overall traini
310、ng quality while meeting sectoral labour requirements,promoting national skill standards and matchmaking communities with workplace training opportunities.In addition to improving training content,PPPs can also play a role in shifting the financing of training provisions to a more integrated approac
311、h that incorporates multiple funding mechanisms including payroll-based training levies,tax incentives,scholarships and donations,vouchers and student loans(Dunbar,2013).URGENT RECOMMENDATIONS FOR POLICY MAKERS Align workforce planning among all stakeholders,including labour agencies,labour unions,t
312、he wider energy industry and educational institutions,to identify critical skill gaps and workforce needs in advance,and to design skill-building strategies accordingly.Provide capacity-building opportunities to a broad range of public sector departments from energy to transport and industry to fost
313、er a more comprehensive policy and technical understanding of different elements of the energy transition.Ensure energy transition goals are reflected in educational programmes and resources,such as university curricula,vocational training institutions,occupational health and safety training institu
314、tions,and professional education programmes.Build the talent pipeline by ensuring young people are exposed to renewable energy and transition career opportunities early in their education;and foster increased participation of women in the energy sector workforce.Invest in reskilling and upskilling m
315、easures for vulnerable communities and those in fossil fuel industries to ensure the employment benefits of the transition are extended to a wide subset of the population.Such measures need to be embedded in broader regional economic revitalisation programmes and investments.Marcel Poncu/shutterstoc
316、k52TRIPLING RENEWABLE POWER AND DOUBLING ENERGY EFFICIENCY BY 2030 SCALING-UP PUBLIC AND PRIVATE FINANCE8Global investment in energy transition technologies reached USD1.3trillion in 20229 a new record high(IRENA and CPI,2023).However,investments remain focused on a few technologies and concentrated
317、 in a limited number of countries.For instance,around 85%of global renewable energy investment benefitted less than 50%of the worlds population and Sub-Saharan Africa received less than 1%of the global total in the past two years(IRENA and CPI,2023).This trend is reflected in renewable power capacit
318、y additions,as all of Africa accounted for less than 2%of additional capacity in 2022(IRENA,2023a;IRENA and CPI,2023).To achieve a tripling of renewable power capacity by 2030,the annual average investment in renewable power generation in the 2023-2030 period would need to reach USD1300billion,compa
319、red to 486billion in 2022.It is equally important that investments to modernise power grids and enhance operational flexibility increase from the annual average investment of USD274billion in 2022 to USD605billion by 2030.10This presents a dual challenge:1)how to scale existing investment flows in c
320、ountries and technologies;and 2)how to ensure these investment flows reach countries that are currently underserved by the energy transition.Efforts to address the much higher cost of capital faced by developing economies as much as three to five times more than in most OECD countries are also neede
321、d(IRENA,2023f).A substantial increase in public funding(especially in developing countries),along with interventions and innovations across fiscal,financial and regulatory policy are needed to drive cross-sector investment and ensure a sufficiently large pipeline of bankable renewable energy and sto
322、rage projects.Repurposing public capital from the fossil fuel sector,including both direct investments and financial support in the form of subsidies,can help accelerate progress towards unlocking the capital required.This public money can then catalyse private capital flows,amplifying investment ef
323、forts towards the USD35trillion required(for the energy transition as a whole)in the remainder of this decade.8)This section draws on the content of the World Energy Transitions Outlook 2023(IRENA,2023a).9)This is as measured by financial investment decisions,actual spend in any year will differ.10)
324、Clean hydrogen here refers to green hydrogen(produced using renewable power)and blue hydrogen(produced using natural gas and complemented by carbon capture and storage CCS technologies).Voyage View Media/shutterstock53 CRUCIAL STEPS TOWARDS 1.5C For example,public financial flows to fossil fuels in
325、the G20 countries alone reached USD1.4trillion in 2022 more than double 2019 levels.Moreover,G20 governments supported the global fossil fuel industry through international aid,export credit support and concessional financing(such as equity,grants,loans and loan guarantees)at an average of USD50bill
326、ion per year from 2019 to 2021(IISD,2023).Public funding is urgently needed for basic energy infrastructure in the developing world,as well as to drive deployment in less mature technologies(especially in end uses such as industry and transport,or synthetic fuel production)and in areas where private
327、 investment is scarce.Without this,the gap in investment between the Global North and the Global South could continue to widen,to the detriment of billions of people and the success of a just and inclusive global energy transition.A more comprehensive definition of risk around investing in energy as
328、sets is needed.A narrow focus on the return risk to investors must expand to encompass environmental and social risks.This approach,which should be exercised through rigorous international benchmarks and protocols for investment,can also help to shift funding from fossil fuel assets to the renewable
329、s sector.With limited public funds available in the developing world,the international community must step up.Public funds(domestic or through international collaboration)must flow through intermediaries (e.g.governments,development finance institutions and global funds such as the Green Climate Fun
330、d).Such instruments should channel public funds towards policies that support structural change and a just transition.Furthermore,these instruments should be designed progressively to ensure economic benefits are shared in an equitable way.Finally,public investments are needed for economic intervent
331、ions to support a more equitable distribution of benefits from large-scale renewables growth.National carbon pricing revenues,for example,could be redirected to support clean,affordable electricity access for lower-income households on a progressive basis.It is also important to actively engage the
332、private sector,given that public financing alone will not be anywhere near sufficient to address the huge investment needs for the global energy transition.The public sector can play a catalysing role by providing a conducive and predictable enabling environment for the long-term investment decision
333、s made in the private sector.Also,governments can set the right conditions for private sector actors to build and finance a viable pipeline of energy transition-oriented projects.For example,blended finance structures would allow concessional public finance,and even philanthropic grant-based finance,to improve the risk-return profile of an investment,so that private capital is attracted at lower c