1、Megatrends in detail:The green economy represents an opportunity to supercharge New Zealand August 2023Boston Consulting Group partners with leaders in business and society to tackle their most important challenges and capture their greatest opportunities.BCG was the pioneer in business strategy whe
2、n it was founded in 1963.Today,we work closely with clients to embrace a transformational approach aimed at benefiting all stakeholdersempowering organisations to grow,build sustainable competitive advantage,and drive positive societal impact.Our diverse,global teams bring deep industry and function
3、al expertise and a range of perspectives that question the status quo and spark change.BCG delivers solutions through leading-edge management consulting,technology and design,and corporate and digital ventures.We work in a uniquely collaborative model across the firm and throughout all levels of the
4、 client organisation,fueled by the goal of helping our clients thrive and enabling them to make the world a better place.BOSTON CONSULTING GROUP3This article is part of a series on BCGs Inaugural New Zealand Megatrends.It outlines the growth in one of the megatrends the green economy and the opportu
5、nity for New Zealand to become a leader in five areas:eco-tourism,sustainable construction,low-carbon energy system,sustainable food production,and green consumer products.The article also builds on the perspectives shared in The Ten Actions to Accelerate New Zealand Towards Net Zero.BCG predicts th
6、e value of the global green economy will reach NZD$9.4 trillion by 2030(see Exhibit 1).This presents one of the largest economic opportunities in decades for New Zealand given the countrys 100%Pure brand,pristine natural environment,abundant renewable energy resources,and sustainability-minded socie
7、ty.To realise these economic opportunities,while preserving and enhancing New Zealands natural environment and mitigating the impact of climate change,BCG has explored five fast-growing opportunities for New Zealands green economy:1.Eco-tourism:Delivering tourism through more environmentally sustain
8、able travel,business practices,and tourism experiences.2.Sustainable construction:Developing more sustainable homes,buildings,and infrastructure,including leveraging the countrys strong position in biogenic building materials.3.Low carbon energy system:Capitalising on New Zealands highly renewable e
9、lectricity system to attract low-carbon industry and enable the net zero transition through electrification of transport,heat,and industrial processes.4.Sustainable food production:Producing world-leading natural and sustainable food through premium product development,aggressive investment in R&D t
10、o reduce agricultural emissions,and adoption of best practice technologies to improve productivity.5.Green consumer products:Developing premium retail products with lower environmental impact,transparent supply chains enabled by digitisation,and clear sustainability metrics to attract a growing segm
11、ent of customers that value sustainability.Exhibit 1 outlines the growth of the global green economy across each of these five opportunities.BOSTON CONSULTING GROUP4Exhibit 1-Consolidated global green products and energy market(NZD,T)BOSTON CONSULTING GROUP51.Eco-tourismTourism is a vital part of Ne
12、w Zealands economy.Domestic tourism expenditure has remained relatively stable at$25 billion per year from pre-COVID levels to current levels in the year ended March 20231.However,international tourism expenditure declined by 90%during COVID from NZD$18 billion per year pre-COVID to NZD$2 billion in
13、 the year ended March 2022.As a result,tourism fell from 20%of New Zealands exports to just 2%.The most recent data is brighter international tourism levels in March 2023 were 20%below pre-COVID levels.As New Zealand emerges from the pandemic,eco-tourism is an opportunity to reinvigorate the tourism
14、 sector and the 100%Pure New Zealand brand.According to Tourism New Zealand data,people actively considering travel to New Zealand score the country highly on its pristine landscapes and scenery,and connection to the land relative to other destinations.Two global trends are changing the nature of to
15、urismRise in eco-tourism:Consumer awareness of the environmental footprint of their travel is on the rise,with 81%of travellers stating that sustainable travel is important.36%of travellers stated they would be willing to pay up to 10%more for air travel with a lower carbon footprint4.Demand for pre
16、mium travel:Consumers are looking for more premium travel experiences.The average spend per traveller in New Zealand grew by 18%in the last three years5.Many travellers that are seeking premium tourism experiences also want these experiences to be environmentally sustainable.The global eco-tourism i
17、ndustry is forecast to grow to NZD$700 billion by 20306,at 14%per year.New Zealand is well placed to build a more prosperous and sustainable eco-tourism industry that meets these changing consumer needs.1.Stats NZ,2023,Tourism satellite account:Year ended March 2023 2.Tourism New Zealand,2023,Active
18、 Considerer reports3.Corporate Traveller,2022,Sustainability in Travel:How to Make a Positive Impact4.Statista,2020,Willingness to pay more for a flight with smaller environmental impact5.Tourism New Zealand,2023,Tourism data6.imarc Group,2022,“Ecotourism Market:Global Industry Trends,Share,Size,Gro
19、wth,Opportunity and Forecast”BOSTON CONSULTING GROUP7.Air New Zealand,Flight NZ08.NZ Transport Agency,2022,National guidance for public electric vehicle charging infrastructure9.Tourism Industry Aotearoa,2023,Tourism Sustainability Commitments Directory10.Construction Sector Accord NZ,2021,Construct
20、ion Sector Accord Progress Report11.Buildings,Dani et al.,2022,“A Comparative Study on the Life Cycle Assessment of New Zealand Residential Buildings”,p.312.thinkstep ANZ,2018,The Carbon Footprint of New Zealands Built Environment13.Green Building Council,2022,“$150 billion economic boost from lower
21、 carbon homes and buildings,reveals new report”6New Zealand can harness the rise in eco-tourismSupport sustainable air travel for international visitors to New Zealand:For most international travellers,New Zealand is a remote destination which is a potential threat to the tourism industry as concern
22、s over the carbon footprint of air miles rise.In the future,potential visitors to New Zealand may choose a destination closer to home if air travel to the country is not sustainable.Anticipating this changing consumer preference,Air New Zealand has committed to at least 10%sustainable aviation fuel
23、by 2030 and has set a target for net zero emissions by 20507.Policy support for decarbonising international travel to New Zealand is likely to be required to protect New Zealands tourism industry over the longer term.Drive low environmental footprint tourism within New Zealand:While improving sustai
24、nable travel to New Zealand is vital,it is also important to ensure tourism within the country becomes more sustainable.Low-emissions domestic transport options include e-bike rentals,electric hire car hires,electric buses,electric trains,and sustainable domestic flights.Sustainable accommodation an
25、d environmentally friendly tourist experiences are also important.A number of initiatives are underway,such as Waka Kotahi,New Zealands leading transport agency,facilitating a nationwide network of fast charging stations for electric vehicles every 75 km along state highways8.Additionally,the touris
26、m industrys 12 Tourism Sustainability Commitments,including nature restoration and waste elimination,have been signed by over 1,800 businesses across New Zealand9.Make the most of New Zealands natural environment:Natural attractions are one of the primary reasons tourists visit New Zealand,and while
27、 consumers are becoming more environmentally conscious,they are also looking for more premium eco-tourism services and experiences and they are willing to pay more for them.International visitors to New Zealand are generally enchanted by its natural beauty,and there is an opportunity to consider how
28、 this can be further leveraged to reinvigorate the tourism industry.2.Sustainable ConstructionConstruction is a major part of New Zealands economy,contributing NZD$21 billion(7%of GDP)in 2019 and employing 275,000 workers(10%of the workforce)10.Adoption of sustainable construction materials in New Z
29、ealand will result in an increasingly low-carbon built environment.New Zealand already has a unique advantage in this area due to its leading position in biogenic building materials.The environmental impact of residential housing in New Zealand is 16 kg CO2 eq/m2/year,roughly one-third of the intern
30、ational median of 50 kg CO2 eq/m2/year,predominantly driven by the use of more wooden materials in New Zealand11.Despite this,the built environment still accounts for around 13%of New Zealands emissions when the full lifecycle of built materials is factored in(from raw materials to operations,such a
31、s energy consumption)12(see Exhibit 2).As a result,the drive for sustainable construction is a significant opportunity.In New Zealand,sustainable construction of new builds could be worth NZD$142 billion by 2050,or NZ$5 billion per year.If retrofitting New Zealands existing building stock to meet ne
32、t zero targets is included,the total economic potential is far greater.BOSTON CONSULTING GROUP7Exhibit 2-Contribution of the built environment to New Zealands carbon footprint from a production,life-cycle,and consumption perspectiveBOSTON CONSULTING GROUP8Two trends are driving the shift to sustaina
33、ble construction Consumer awareness of the environmental impact of the built environment:More consumers are conscious that building materials such as steel or concrete often contain embedded emissions,which leads them to consider procuring and using lower carbon options or alternatives such as wood.
34、Government and commercial entities are also becoming increasingly aware of their scope three emissions these are an entitys indirect emissions that result from procuring goods and services.Sustainable construction policies and standards:Regulations in New Zealand and around the world are being updat
35、ed to drive more sustainable construction.For example,the New Zealand government has introduced minimum healthy home standards for all rental homes,which include insulation and stopping wind draughts to improve energy efficiency.The government and the construction sector are also driving direct chan
36、ge by developing green building standards that set benchmarks for sustainable housing and buildings.The New Zealand Green Building Council has introduced Greenstar building standards and Homestar housing standards,and administers the government-backed NABERSNZ energy efficiency rating system for com
37、mercial buildings.New Zealands construction sector can unlock significant opportunities in the green economy Embrace circular economy opportunities within the construction industry.Using waste materials in construction will reduce the carbon footprint of building materials and construction waste.For
38、 example,Golden Bay Cement is using a circular economy solution that reduces coal consumption by using waste tyres and wood to develop a new cement product.The new product reduces waste and reduces the embedded emissions of cement by 27%14.Design homes and buildings with lower environmental footprin
39、ts.Homes and buildings have both embedded and operational environmental footprints.The embedded footprint comes from the carbon and environmental impact of the materials used(e.g.,cement,steel,aluminium)during building,and the operational footprint refers to the energy and water consumed inside the
40、buildings once completed.Homes and buildings that use wood and lower carbon materials will have a lower embedded footprint.New Zealand can reduce the operational footprint of homes and buildings through improved energy efficiency and solar and batteries.For example,Fletcher Living recently introduce
41、d a Low Carbon 1.5C Homes Pilot,with solar panels,high levels of insulation,and efficient heating and cooling that can reduce the operational carbon emissions of a home by up to 85%15.Make economically viable energy efficiency upgrades to existing New Zealand homes and buildings.Between now and 2050
42、,new homes and buildings will make up 40%of New Zealands building stock16.As the existing building stock will still comprise most of the homes and buildings in 2050,it will be important to consider how the operational footprint of these can be improved.Government initiatives like the Warmer Homes pr
43、ogram seek to improve the insulation and the efficiency of heating systems to make homes warmer,drier,and healthier and produce a lower operational footprint.14.Golden Bay,2022,EcoSure Cement Type GP15.Newsroom NZ,2022,“Taking the gas out of green house:How to cut 270T of residential CO2 down to 39”
44、16.New Zealand Green Building Council,2022,“Near zero emission houses and offices”BOSTON CONSULTING GROUP9Increased adoption of industry standards for greener construction.The number of green homes in New Zealand is on the rise(see Exhibit 3),and an evolution to more environmentally focussed buildin
45、g standards will continue to reduce both the embedded and operational footprint of homes and buildings.However,the adoption of these standards are still below the levels required to release the full potential of sustainable construction in New Zealand.The sector and Government have the opportunity t
46、o work together to increase the adoption of these programs.Exhibit 3-Number of buildings and homes with green certifications has been rising in New Zealand by 28%CAGR in the last three years BOSTON CONSULTING GROUP103.Low-Carbon Energy SystemA low-carbon energy system presents a very large opportuni
47、ty for New Zealand to attract low-carbon industries and enable the net zero transition through the electrification of transport,heat and industrial processes.Energy has the potential to play a significant role in our decarbonisation targets,as it represents 40%of national emissions and 70%of net zer
48、o carbon target emissions,which exlcude biogenic methane17.BCG estimates that the New Zealand electricity sector to drive 70%of the gross emissions reductions required to reach net zero by 205018.New Zealand is already a world leader in renewable energy,with 80-85%of electricity coming from renewabl
49、e sources.Due to the countrys abundant renewable resources,BCG forecasts New Zealand can cost-effectively achieve 98%renewable electricity by 2030.The installed capacity of renewable electricity will also need to increase as transport and heat electrification drive new demand growth.Three trends are
50、 shaping the energy sector in New ZealandThe drive to reduce energy emissions globally and in New Zealand.Energy is the largest source of emissions globally.As a result,countries are placing a lot of focus on the energy transition.For example,the recently signed Inflation Reduction Act in the United
51、 States commits NZD$600 billion of investment to clean technology over the next 10 years19.Improving clean energy technology and cost reductions.Global investment has driven down clean energy technology costs.Between 2010 and 2020 the cost of wind fell by 65%while the cost of solar fell by 90%20.Whi
52、le supply chain constraints are currently impacting clean energy technology prices,we expect the long-term trend of declining prices will continue.Other clean energy technologies like hydrogen and battery storage are also improving and costs are expected to continue to decline.Government policies to
53、 incentivise emissions reduction.New Zealand policies like the Emissions Trading Scheme,Clean Car Discount,Clean Car Standard,and the Government Investment to Decarbonise Industry Fund are all starting to strongly incentivise energy emissions reduction.Since the introduction of the clean car discoun
54、t the uptake of electric and hybrid vehicles have increased by five times21.Energy emissions in 2022 were 12%lower than they were in 201922.The energy sector can help New Zealand to rapidly decarbonise and attract new industryAccelerate the development of renewable energy.The sector has already made
55、 significant progress towards increased renewable generation and is expected to exceed 90%renewable by 2025.However,to achieve the 4.8 GW of new generation needed by 2030,a significant ramp-up in delivery is required.Electrify transport,process heat and industrial processes.Enabling rapid electrific
56、ation of transport and heating,powered by renewable electricity,can reduce New Zealands emissions by 18.4 Mt CO2-e per year by 205023.It also makes economic sense as electrification represents some of the lowest-cost emissions reduction opportunities across the economy.For example,we estimate that f
57、rom 2026,electrification of transport will save consumers money while reducing emissions representing a win-win outcome for the country.Develop a new low-carbon industry in New Zealand.Growing corporate preference for 100%renewable electricity presents an opportunity to leverage New Zealands highly
58、renewable electricity system to facilitate a low-carbon energy-intensive industry.Green data centres present an opportunity for New Zealand to improve data security through onshore data storage,and potentially export data services export to Asia.This could also enable greater growth in New Zealands
59、digital economy by attracting leading global technology companies to the country.Efforts are already being made to unlock this industry,with two prominent examples.Microsoft has announced three new carbon-neutral data centres in New Zealand24.Amazon has also announced NZD$7.5 billion in investment i
60、n data centres in New Zealand25.17.NZ Ministry for the Environment,2020,“New Zealands Greenhouse Gas Inventory 1990-2020 snapshot”,p.218.BCG,2022,“The Future is Electric”19.The White House,2022,Inflation Reduction Act Guidebook20.International Renewable Energy Agency,2021,“Renewable Power Generation
61、 Costs in 2020”,p.321.Motor Industry Association NZ,2023,Hybrid,PHEV and EV Statistics22.Ministry of Business,Innovation and Employment,New Zealand energy sector greenhouse gas emissions,Quarterly electricity and liquid fuels emissions data table23.BCG,2022,“The Future is Electric”,p.1124.RNZ,2022,“
62、Microsofts NZ datacentres to be powered by carbon-zero electricity”25.CRN Australia,2021,“AWS to open$7.25b data centre in Auckland,NZ”BOSTON CONSULTING GROUP11Sustainable food productionAgriculture and food production is critical to the New Zealand economy,providing NZ$40 billion in annual exports(
63、67%of goods exports and 47%of total exports)26.New Zealands strong agriculture sector stems from its favourable climate and geography,high-quality soils,use of advanced farming techniques,and a strong regulatory environment.However,agriculture also contributes 48%of New Zealands gross greenhouse emi
64、ssions,dominated by the production of animal products from dairy,sheep,and beef,as outlined in exhibit 427.Over 90%of agricultural emissions,such as methane emissions from ruminant animals and nitrous oxide emissions from soils and fertiliser,are hard-to-abate.Despite this,consumers and governments
65、are increasing their scrutiny of the agricultural industry and calling for reduced emissions and increased sustainability.Exhibit 4-New Zealand Agricultural emissions by source and type 26.Stuff.co.nz,2019,“New Zealands primary sector exports reach a record$46.4 billion”27.New Zealand Ministry for t
66、he Environment,2022,“Aotearoa New Zealands first emissions reduction plan”,p.249BOSTON CONSULTING GROUP1228.New Zealand Story,2019,“The New Zealand Story Research”29.agresearch New Zealand,2021,“Research shows NZ dairy the worlds most emissions efficient”To continue growing its agricultural sector,N
67、ew Zealand will need to increase the use of sustainable farming practices to produce sustainable food.Sustainable food is produced,processed,and distributed in a way that minimises harm to the environment and supports the well-being of communities and animals.Sustainable farming is important,as 89%o
68、f New Zealands exporters believe that New Zealands Pure brand image is important to their business,including in the agricultural sector28.The opportunity is even larger,as New Zealand is well-positioned to lead the sustainable agriculture and food sector globally.Already,New Zealands agricultural pr
69、oducts are some of the lowest carbon and most environmentally friendly in the world.For example,the carbon footprint per unit of milk production in New Zealand is the lowest in the world and roughly half the global average,as outlined in exhibit 529.Exhibit 5-New Zealand Dairy emissions intensity re
70、lative to other global milk producersBOSTON CONSULTING GROUP13New Zealands food industry is being affected by four trendsMore demand for premium food:Demand is increasing for premium agricultural products that are natural and environmentally friendly.According to a 2020 survey by the International F
71、ood Information Council,62%of consumers are willing to pay a premium for sustainably grown or produced food products30.There is an opportunity for New Zealand producers to earn a premium by reducing environmental impact and improving the traceability of New Zealand produce to prove its provenance.De
72、crease in agri-tech costs and rapid adoption of advanced agriculture systems:Advances in agricultural technology are driving greater resource efficiency and production yields.Vertical farming can improve yields per hectare by 10-20 times31 and reduce water consumer by 70-95%relative to traditional a
73、griculture32,but with a trade-off of higher per hectare costs and energy consumption.However,as agri-tech advances,its cost is coming down and becoming more accessible to farmers.For example,the cost of livestock monitoring systems has decreased by 50%in the past five years due to advances in sensor
74、 technologies33.Rise in alternative proteins and alternative milk.Alternative proteins are a potential challenge to the meat and dairy industry given their environmental and animal welfare outcomes.Exhibit 6 outlines that alternative meat protein consumption is expected to grow at 15%per year to 203
75、5 as the cost decreases34,and products improve in taste and texture.BCG forecasts that in the meat industry,animal-cell-based alternative proteins could reach cost-parity with animal-sourced proteins by as early as 2032 which,when combined with superior environmental and animal-welfare outcomes,is a
76、n attractive value proposition for consumers.To stay competitive,the New Zealand agricultural industry will need to improve the environmental impacts from animal-based farming.There is also the potential for New Zealand businesses to consider whether expansion into alternative proteins is an opportu
77、nity.30.International Food Information Council,2021,“Consumers are paying more attention to ingredient lists,report finds”31.US Department of Agriculture Agricultural Research Service,2022,“Vertical Farming No Longer a Futuristic Concept”32.Urban Green Farms,2022,About Vertical Farming33.Ag Funder N
78、ews,2022,“Can Agtech solve the problem of livestock disease outbreaks”34.BCG,2021,“Food for Thought:The Protein Transformation”BOSTON CONSULTING GROUP14Policy and regulatory efforts to reduce agricultures environmental impact:The New Zealand Government has committed to reducing biogenic methane emis
79、sions by 10%by 2030 compared to 2017 levels,and by 24-47%by 205035.This is more conservative than one of New Zealands main dairy competitors Ireland which aims to cut agricultural emissions by 25%by 2030 compared to 2018 levels36.Additionally,the Government recently announced that New Zealand would
80、be the first country to price agricultural emissions from 2025.A direct price on agricultural emissions is likely to send a strong price signal to reduce emissions.Exhibit 6-Cost of production of alternative meat proteins35.New Zealand Ministry for the Environment,2022,“Aotearoa New Zealands first e
81、missions reduction plan”,p.24936.Ireland Department of Agriculture,Food and the Marine,2022,“Pathway to 51%reduction in economy-wide emissions agreed McConalogue confirms 25%reduction in agricultural emissions”BOSTON CONSULTING GROUP15New Zealand can lead the world in sustainable agriculture Capital
82、ise on the premiumisation of food by producing leading natural and sustainable products:Producers will need to improve the sustainability of existing products and expand into new product categories.Existing products can become more premium with greater supply chain transparency,ethical sourcing,and
83、certifications and trademarks.For instance,Lewis Road Creamery produces single-breed,organic dairy products for New Zealanders and for export37.The farms are independently certified under the 10 Star Certified Values program which stipulates strict environmental,animal,and human welfare requirements
84、38.Aggressively invest in R&D to reduce agricultural emissions:New Zealand has a pasture-based farming system which differs from many other farming systems that rear animals on grains in barns.It is likely to be easier for grain-based farming systems to reduce emissions as methane inhibitors can be
85、added to grain feed more easily than to grass.As a result,New Zealand will need to lead the way in R&D for methane-reducing technologies in a pasture-based farming system.With over 90%of emissions being hard-to-abate in the agricultural sector,partnering with peer organisations and the government wi
86、ll be critical to unlock technological progress.For example,the Government is investing NZ$339 million to accelerate technological development through the new Centre for Climate Action on Agricultural Emissions39.The Centre is set up as a public-private partnership,with the Government working alongs
87、ide agri-business leaders ANZCO Foods,Fonterra,Rabobank,Ravensdown,Silver Fern Farms,and Synlait to advance methane-reducing technologies like feedstock additives,methane vaccines,and methane inhibitors.Technologies are already showing early signs of promise.For example,Fonterra is trialing develope
88、d KowbuchaTM,a set of probiotics in a trial that could reduce biogenic methane emissions in cows by 20%40.Reduce environmental impact and improve productivity by adopting emerging technologies and best practices.Adopting agri-tech and regenerative agricultural techniques can reduce farm environmenta
89、l impact whilst improving productivity.For instance,precision agriculture methods such as smart water management systems can reduce water required for irrigation by 20%while minimising soil erosion and reducing the risk of disease.Precision agriculture methods that employ advanced geoanalytics can e
90、nable more targeted use of fertiliser,reducing emissions and improving soil health.New Zealand companies are already adopting new technologies,with Synlait and Open Country Dairy operating New Zealands first large-scale electrode boilers to process milk and clean production lines41.37.Lewis Road Cre
91、amery,2019,“First single breed standard milk launched by Lewis Road Creamery”38.Lewis Road Creamery,2021,“Lewis Rd Creamery owner to get loan discounts for hitting environmental farming targets”39.NZ Ministry for Primary Industries,Centre for Climate Action on Agricultural Emissions40.Reuters,2022,“
92、On New Zealand farm,scientists reduce cow burps to save the world”41.Synlait,2019,“Synlait has switched on New Zealands first large-scale electrode boiler”BOSTON CONSULTING GROUP16Green Consumer ProductsThe retail sector is a significant part of the New Zealand economy,with over NZ$112 billion in re
93、venue,and employing 220,000 New Zealanders(9%of New Zealands workforce).However,retail goods have a significant environmental impact,representing 40%of global plastic usage and more than 25%of global emissions,when accounting for whole-of-life environmental impacts42.Green consumer products are thos
94、e which are designed,manufactured,and marketed in a way that minimises environmental impact.Up to 80%of consumers think about sustainability in their day-to-day purchases43,and products such as organic food and biodegradable packaging are opportunities for environmentally conscious consumers to mini
95、mise their environmental impact.Interest also varies by industry.Consumers are most engaged with sustainability topics for things they buy often,such as food,drinks,and personal items as outlined in exhibit 744.42.BCG,2022,“Sustainability in Retail is Possible But Theres Work to Be Done”43.BCG,2022,
96、“Consumers Are the Key to Taking Green Mainstream”44.BCG,2021,“The Consumer Sustainability Journey”Exhibit 7-Consumer sustainability interest varies across different industries BOSTON CONSULTING GROUP17Three trends are driving the growth of green consumer products:Personalisation as table-stakes and
97、 a drive for products to reflect consumer value:Consumers increasingly want products to reflect their individuality,including their environmental and social sustainability values.72%of consumers want brands and products to reflect their environmental and social values45.Conscious consumption,with a
98、particular focus on health and environmental impact:A report by Nielsen Insights suggests 70%of consumers would change their consumption habits to reduce their impact on the environment,placing greater emphasis on targeted purchasing decisions in line with their values46.As a result,consumers are de
99、manding greater transparency on product and supply chain sustainability.Increased digitisation of consumer purchases.Accelerated by Covid-19,consumers have heightened expectations of e-commerce,supported by frictionless fulfilment,through click-and-collect and/or home delivery.E-commerce purchases h
100、ave nearly tripled as a share of total retail sales from 7%in 2015 to 20%in 2022,representing a major shift in consumer preferences47.New Zealand product producers and retail businesses can address these changing consumer preferences Deliver premium retail products with lower environmental impact,es
101、pecially on key issues such as waste minimisation:Recycling and reducing waste are the two most important environmental considerations for consumers for food,drink,personal and retail products.Some New Zealand companies have been focusing on sustainable,premium products-for example,Ecostore has esta
102、blished a position in New Zealand as a leading sustainable brand,providing low environmental impact goods and a comprehensive circular economy offering48.Delivering services,such as refill stations and container drop-offs,100%recycled packaging and plastic-free products49,has helped Ecostore to deve
103、lop a successful sustainable brand.Provide greater supply chain transparency by digitising supply chains:71%of New Zealanders are actively researching a products environmental impact before making a purchase50.Digitising supply chains enable greater transparency for organisations and opportunities t
104、o optimise their supply chain(e.g.,ensuring ethical suppliers and finding opportunities to reduce carbon footprint)whilst entrenching consumer trust.Similarly,attracting trademarks and certifications from respected institutions can deliver significant economic benefits.One study found sustainability
105、 certifications enable upwards of 45%higher price premiums and improved market access by up to 85%51.Measure,report,and promote sustainability metrics.In addition to making meaningful sustainability improvements to products,New Zealand businesses must measure,report,and communicate sustainability ef
106、forts to consumers.Consumers want confidence that products they purchase are sustainable across a range of dimensions:up to 40%of consumers are more likely to make sustainable choices when sustainability is linked to the environment and other factors such as health,safety,and quality52.However,consu
107、mers lack quality information about how sustainable products are:80%of Kiwis feel that communication from businesses on their social and environmental commitments is confusing53.As the transition to a green economy accelerates New Zealand is well-positioned to capitalise on the numerous opportunitie
108、s this presents.Leaders need to consider the implications of these green economy trends for their business and how this could impact value.45.Retail TouchPoints,2020,“72%of US consumers want brands to reflect their values”46.The Conversation,2020,“Climate explained:are consumers willing to pay more
109、for climate-friendly products?”47.Statista,2022,E-commerce as percentage of total retail sales worldwide48.Inside Retail,2019,“Ecostore named leading sustainable brand in NZ for fifth consecutive year”49.Ecostore,About Us50.Sustainable Business Council NZ,2019,“In Good Company How New Zealanders ass
110、ess the sustainability of brands”,p.2051.My NZTE,2021,Understanding sustainability certifications&accreditation options52.World Economic Forum,2023,“How companies can scale green businesses for a net zero world”53.INCLEAN NZ,2019,“NZ businesses need to promote sustainability credentials,says ecolabe
111、l head”BOSTON CONSULTING GROUP18For information or permission to reprint,please contact BCG at .To find the latest BCG content and register to receive e-alerts on this topic or others,please visit .Follow Boston Consulting Group on Facebook,LinkedIn and Twitter.Boston Consulting Group 2023.All rights reserved.04/23AUTHORSGeoff Healy,Managing Director and PartnerPhillip Benedetti,Managing Director and PartnerRebecca Russell,Managing Director and PartnerRichard Hobbs,P