个人中心
个人中心
添加客服WX
客服
添加客服WX
添加客服WX
关注微信公众号
公众号
关注微信公众号
关注微信公众号
升级会员
升级会员
返回顶部
大运新城创研文化村详细蓝图及建筑改造方案(108页)
大运新城创研文化村详细蓝图及建筑改造方案(108页).pdf
下载文档 下载文档
专题资料
上传人:偷**** 编号:606955 2022-10-12 108页 100.24MB
1、三所建筑改造设计Design Proposal of Sansuo Renovation12002大运新城创研文化村详细蓝图及原三所建筑改造设计方案Master Plan of Dayun New Town Creative Park and architecturAL Design Proposal of Sansuo Renovation地点:深圳龙岗设计:201209201211规模:185930平方米Location:Shenzhen,LonggangDesign Period:201209-201211Scale:185930sq.m.INTRO 介绍Why preserving S2、ansuo?1.Unique architectural typology and good structural condition“三所”的建筑类型原为拘留所用途,其空间布局及建筑形式非常具有独特性。并且,其建筑在九五年建成,建筑质量很好,本着节能环保及可持续发展的大思路,对其现有建筑进行升级改造,更能体现大运新城创研文化村的独特且不能被复制的个性。2.Sansuo as a creative power gernerator for creative industries in the district 基于对大运新城的发展趋势进行研究后,此地区将会集合大型住宅板块、商贸服务功能板块,大3、专院校板块,以及多个产业研发板块。“三所创研文化村”将为基地周边的研发创意产业提供中心,并能积极整合周边各个功能板块资源。3.Sansuo as a new destination for Dayun New Town 三是为了为大运新城提供一个新的目的地。为成功打造成文化村的地位,除了为创研产业提供知识积累及交流平台,更能为周边社区提供独特的休闲公共空间。龙岗在大运后时代中,“三所”也能为大运场馆周边提供一个特色的旅游目的地。为什么保留三所?EXISTING CONDITION 现况EXISTING BUILDINSS 现有建筑EXISTING BUILDINSS 现有建筑Main acce4、ss to the site Exising highwayIDENTIFYING THE PROBLEMS 识别问题Highway under construction1.Isolation of the site 隔离的位置15 mins walking5 mins walking15 mins walking5 mins walking2.Long distance from the city center 与市中心距离长度3.Closure spaces in jail 监狱内的封闭空间Enclosure in courtyardsRepetitive cellsplant rooms5、ervices buildingservices buildingpre-trial centredetention centrecourt roomtrial roomscanteenholding areacommercial7.6 m31.9 mplant roomservices buildingservices buildingpre-trial centredetention centrecourt roomtrial roomscanteenholding areacommercialCutting through courtyards to open up the jailAx6、is relates to the community accessCOMMERCIALINSTITUTIONALRESIDENTIALPUBLICINDUSTRIALEDUCATIONAL龙城工业园 Longcheng Industrial Park大运新城产业LOFT区Dayun R&D LOFT districtR&DIndustrial upgrade三所Sansuo产业升级产业研发20120907 SITE ANALYSIS DIAGRAM 基地分析图Sansuo connection with Longcheng Industrial Park and Dayun LOftCOMM7、ERCIALINSTITUTIONALRESIDENTIALPUBLICINDUSTRIALEDUCATIONAL住宅区Residential AreaCommunityNature三所Sansuo自然环境社区群体Sansuo connection with local community20120907 SITE ANALYSIS DIAGRAM 基地分析图Creative Village 1.0(Initiator)Creative Village 2.0Start Zone Established Artists/Designers/FirmsSpin ofStart-up Artist8、sPublic/Visitors/Tourists Artists InterfaceCREATIVE INDUSTRYPUBLICProgram:-Public park-Sculptural landscape-Art installation-Art galleries-Art display wallTarget group:-Public-TouristsProgram:-Artist residence-Fabrication cells/workshops-Artist studios/galleriesTarget group:-Start-up Artists-Small d9、esign frmsPartial demolition&New addition:-JailProgram:XXEstablished Artists/DesignersPublic/TouristsSpin ofArtist InterfaceProgram:-SOHO/Hotel-Large scale workshop-Exhibition-Commercial Target groups:-Established Artists-HIgh end design frms-EntrepreneurFurther renovation-JailProgram:XXCreative Vil10、lage 1.0Creative Village 1.5Creative Village 1.5+Creative Village 2.0Sculptural park Government upgrade and improve the landImproving infrastructureLandscapingBuilding up histrorial signifcance through EVENTSVALUE ADDED to the land Land soldDeveloper starts construction doc.Developer starts construc11、tion Sansuo Phasing Development Yr 1Yr 2Yr 3Yr 4Start Zone R&D Village$ZONING STRATEGY 分区策略Creative Village 1.0Artist incubation/Artist InterfaceCreative Village 1.0(Initiator)Creative Village 2.0Start Zone Established Artists/Designers/FirmsSpin ofStart-up ArtistsPublic/Visitors/Tourists Artists In12、terfaceStart zonePublic Park/Sculptural Lanscape/Art installationCreative Village 2.0Creative ParkPHASING DEVELOPMENT(Government&Developer management/development model)逐步发展(政府和开发管理/开发模式)Program:-Public park-Sculptural landscape-Art installation-Art galleries-Art display wallTarget group:-Public-Tour13、istsNew developmentProgram:-Housing-R&D incubators-Reserach lab/workshopTarget group:-Professors/students from CUHK longgang-Researchers/Scholars Program:-Artist residence-Fabrication cells/workshops-Artist studios/galleriesTarget group:-Start-up Artists-Small design frmsPartial demolition&New addit14、ion:-JailProgram:XXEstablished Artists/DesignersPublic/TouristsSpin ofArtist InterfaceProgram:-SOHO/Hotel-Large scale workshop-Exhibition-Commercial Target groups:-Established Artists-HIgh end design frms-EntrepreneurFurther renovation-JailProgram:XXCreative Village 1.0Creative Village 1.5Creative V15、illage 1.5+Creative Village 2.0Sculptural park Government upgrade and improve the landImproving infrastructureLandscapingBuilding up histrorial signifcance through EVENTSVALUE ADDED to the land Land soldDeveloper starts construction doc.Developer starts construction Sansuo Phasing Development Yr 1Yr16、 2Yr 3Yr 4Start Zone R&D Village$PHASING DEVELOPMENT(Government&Developer management/development model)逐步发展(政府和开发管理/开发模式)RESEARCH&CASE STUDIES 研究部分和个案研究CREATIVE PARK EVOLUTION 创意园区的演化CREATIVE PARK EVOLUTION-CASE STUDIES 创意园区的演化-个案研究CASE STUDY METHODOLOGY 案例研究的方法CASE STUDY PROGRAM CLASSIFICATIONS 案例研17、究的功能分类Case Study 项目:M50 莫干山路艺术区Location 地点:Shanghai 上海Year of Construction or Renovation 改造年份:2000Case Study 项目:1933老厂房Location 地点:Shanghai 上海Year of Construction or Renovation 改造年份:2007Case Study 项目:The Bridge 8 八号桥Location 地点:Shanghai 上海Year of Construction or Renovation 改造年份:2003Case Study 项目:79818、艺术区Location 地点:Beijing 北京Year of Construction or Renovation 改造年份:2002Case Study 项目:Redtory 红砖厂创意艺术区Location 地点:Guangzhou 广州Year of Construction or Renovation 改造年份:2009Case Study 项目:F518 IDEA LAND F518时尚创意园Location 地点:Shenzhen 深圳Year of Construction or Renovation 改造年份:2007Case Study 项目:The Redhouse 西19、门红楼Location 地点:Taipei 台北Year of Construction or Renovation 改造年份:2009Case Study 项目:Huashan Creative Park 1914华山文创园区Location 地点:Taipei 台北Year of Construction or Renovation 改造年份:2007Case Study 项目:Songshan Cultural and Creative Park 松山文创园区Location 地点:Taipei 台北Year of Construction or Renovation 改造年份:201020、CASE STUDY PROGRAM BREAKDOWN 案例的功能分布DEVELOPMENT TYPOLOGIES 发展类型CREATIVE PARK STAKEHOLDERS 创意产业园的利益相关者CREATIVE PARK SUCCESS METRICS(3 Ps)创意产业园成功的度量CASE STUDIES OF RENOVATION FROM THE JAIL 监狱改造例子Case Study 项目:SCAD Hong Kong 萨凡纳艺术设计学院Location 地点:Hong Kong 香港Year of Construction or Renovation 改造年份:2010C21、ase Study 项目:Lorton Prison Location 地点:Virginia 弗吉尼亚州Year of Construction or Renovation 改造年份:2008Case Study 项目:Mount GambierLocation 地点:Melbourne 墨尔本Year of Construction or Renovation 改造年份:2010Case Study 项目:Central Police Station 旧中区警署Location 地点:Hong Kong 香港Year of Construction or Renovation 改造年份:222、014MASTERPLAN DESIGN PROCESS 总体规划设计过程Sansuo Creative ParkPrecedents for BridgeThe CreativeMural vs Graffiti:active and passive strategies for minimal intervention.Artists can be commissioned to promote the site with murals,or the process can be allowed,even encouraged to happen organically.The Exper23、ientialInstallation vs Sculpture:strategies for dynamic intervention on the site.Space can be made interactive,with sculpture and trails,or passive,with lighting used to create experience.The SymbolicBridge itself becomes part of the art-work,part of the experience.MASTERPLAN DESIGN PROCESS 总体规划设计过程24、Upscale Mixed-Use(OCT Bay)Program:commercial,estabilished galler-ies,ofce and residentialNodal path-A North/South axis to connect all parts of the site to the jail.-Defned by sculpture,pocket parks or small program-matic pavillions.Bernard Tsumi:Parc de La Villette Police Station:No ChangeCreative V25、illage Program:R+D research laboraties/lofts,New Museum/Concert hall,Jail/Creative incubator Artists Retreat(CUHK Upper Campus)Program:residential village with some amenities and hotel R+D Ofce and Education ParkProgram:Ofces,commercial,entertainment,CUHK University R+D spin-of(virtual campus)1a2 1b26、31.To create a strong contrast between the jail and its surrounding parcels.2.Grids based on N/S and E/W connections3.Easily identifable parcels which relate to neighboring context.MASSING CONCEPT 体量概念 Upscale Mixed-Use(OCT Bay)Upscale Mixed-Use(OCT Bay/European Boulevard)-Pedestrian friendly street27、s with 6-7 storey tall mixed use buildings.-Zones created by paths can be special-ized neighborhoods“theater district”,“pop-art district”etc.Sculpture plazaNature or art related plazas which help to create a visual link,and create unique spaces within the grid.MASSING CONCEPT 体量概念 Artists retreatR+D28、 Ofce and Education Park-Programmatically integrated with CUHK campus R&D university component.Artists retreatCreative Village+R&D linked laboratories-Jail wall to be demolished and surrounding context to be“fattened”to accomodate a new lab program zone.-Larger buildings to defne edge and create dis29、tance and space for creative village.MASSING CONCEPT 体量概念 Sansuo三所Dog Training练狗场Natural Boundary基地范围Existing Buildings现有建筑Building Demolished拘留所Transformer发电站Main Building主楼Police Station公安局SANSUO EXISTING SITE CONDITION 三所现有的场地条件概念方案图NATURENATURE野外拓展训练足球场游泳池艺术品商店画具超市雕塑绿岛绿道种植林场大地景观链接都市恢复生态疏林草坪Art I30、nstallation攀岩SOHO咖啡迷宫花园壁画wargameCONCEPT SKETCHES 概念草图MASTER LAYOUT PLAN-FAR 1.2 总体布局规划-FAR 1.2UPPER ZONEDEVELOPER:67,500m2FAR 1.2CREATIVE INCUBATORURBANUS&NODE:studios,fabrication cells,design shops LOWER ZONE0-OFFICE:rail terminal,public park,temporary pavilion,carparking GREEN CORRIDORPUBLIC CARPA31、RK200 spacesLIGHTRAIL UPPER ZONEDEVELOPER:113,500m2FAR 2CREATIVE INCUBATORURBANUS&NODE:studios,fabrication cells,design shops LOWER ZONE0-OFFICE:rail terminal,public park,temporary pavilion,carparking GREEN CORRIDORPUBLIC CARPARK200 spacesLIGHTRAIL MASTER LAYOUT PLAN-FAR 3 总体布局规划-FAR 31234567891314132、516171819121110PEDESTRIAN PATHNEW ROADSNEW BLOCKS1,200 m2 typicalSMALL OFFICE/INCUBATOR11,500 m2PRODUCTIONWAREHOUSE15,000 m2MUSEUM/EXHIBITION5,000 m2HEADQUARTER/CREATIVE OFFICE2,000 m2 typicalSITE AREA:30,000 m2PROGRAM AREA:36,000 m2FAR:1.2total SITE AREA:56,800 m2totalPROGRAM AREA:67,500 m2FAR:1.2U33、PPER ZONE 北区4DUMBO Historic DistrictCREATIVE PARK CASE STUDY RESEARCH 2012 09/19SITE COMPARISON:DUMBO Historic DistrictSansuo Creative ParkSite Area:56,800m2Site Area:121,000m2Program Area:113,500m2Program Area:408,000m2FAR:2.0FAR:3.3标题UPPER ZONE 北区UPPER ZONE 北区UPPER ZONE&BAR BUILDING 北区与条码底层规划UPPER34、 ZONE&MASTERPLAN 北区与总体规划MASTERPLAN FROM MENG 孟工规划蓝图ARCHITECTURE DESIGN PROCESS 建筑设计过程Jail renovation strategiesMinimal-Bottom upCustomization of individual cells initiated by a progress of EVENTSLong term processAllow long enough time for the creative art incubation and sedimentation of art traces i35、n different events in order to let the creative ecology grow by itself,its a long term process for people to see what the jail would be transformed to at last The wall is first transformed to open the jail and gain popularity while the artists are moving in and starting up the creative work in the j36、ailPart of the jail will be trasformed and integrated with new structure to become a new program while the rest is being renovated into creative village One shot+long term processOne shot+long term processRenovation of individual cells+Transformation of the WALLAdding megastructure into the courtyar37、ds and integrate with the cells IntermediateMaximum-Top down ARCHITECTURAL RENOVATION STRATEGIES 建筑改造策略INTERMEDIATE RENOVATION STRATEGY 中级改造策略Wall transformation The wall has a symbolic meaning to the jail,its not only for security,containment,isolation etc.it also means a separation of 2 different 38、worlds and different systems.You dont want people to look through the wall and know whats happening behind the wall,thats why we build a wall for jail,to hide the sin,the wound from the rest of the society.Now the jail is going to be transformed to a creative park,the first thing we need to do is to39、 BREAK the wall,to dissolve it and transform it into something permeable,transferrable and engaging.So we propose the concept of“urban curtain”that acts as an artist interface between the creative park and the community for every kind of creative display and performance and public/artist interaction40、 to take place.Free the Wall-Solid to transparent-Inpenetrable to permeable-Isolation to public egagingUrban Curtain-an artist interface between the creative park and community-flexible for temporary programs ie.art display,performance,graffiti,sculpture to plug in Ring-thickening of the urban curta41、in to become a relatively permanent programmed space ie.exhibition,performanceName:Flintholm SPARKType:invited competition,1st prizeTask:collaboration public buildingClient:frederiksberg municipalitySize:4.000 m2(phase 1)+2.000 m2(phase 2)Year:2010Collaboration:mvrdv,sla,sren jensen consulting engin42、eers,imitio,max fordham,winie rickenThe building is a new urban typology with its mix of community centre,exhibition and performance,playground,park and health centre.The 3 volumes are wrapped in an urban curtain that acts as frame for the garden.It offers great flexibility and can be used for art p43、rojects,bicycle parking,water and light installations,performances and curtains.INTERMEDIATE RENOVATION STRATEGY 中级改造策略Art museum R&D incubatorsCreative Village 1.0Artist residence/HotelR&D Village-CUHK R&D Creative Village 2.0MAXIMUM RENOVATION STRATEGY 最大改造策略Top down process In oppose to the botto44、m up renovation process for the growing of creative village,the government intervenes at the very beginning and initiates a big move to transform the existing jail.Part of the jail could be changed drastically to become art museum while the rest of the jail is remained for the incubation of creative45、 work.Master Plan DevelopmentCreative Village Incubation Chain1Artist Newcomer gains recognition from display in sculpture show and is able to rent out a small studio space in art incubator ofce in new development2Sculptor encourages friends and aquain-tances to participate in artists workshop inren46、ovated jail cells of the creative village.EVENT 1Sculpture ExhibitEVENT 2Artists WorkshopYear 0:Start Up Zone landscaping and Prisoner displacementYear 1:Jail Renovation and New Construction Year 2:Jail Renovation and New Construction3Publicity creates collaborative opportuni-ties for sculptor and h47、e expands his studio with a few employees.Nature Hike ExtensionBOTTOM-UP CREATIVE VILLAGE INCUBATION 自下而上的创意村孵化器Year 3+:New Construction within JailEVENT 4Mural ExhibitionEVENT 5Large Scale PerformanceEVENT 3Fabrication Workshop4Small sculpture company invests in and sets up fabrication workshop eve48、nt in Jail 5Small sculpture company sells locally crafted art works in commercial art galleries6Sculpture studio has enough capital to invest in converted studio spaces in creative village and invites mural artists to customize its shop cluster7Total area upgrade to high end cultural center in Longg49、ang and construction of Iconic performance/culture centers in Village 3.0Year 2:Jail Renovation and New ConstructionCONCEPT SKETCHES 概念草图JAIL RENOVATION STRATEGIES 监狱改造策略The Wallx2x3x10Along the WallOn the Wall Public on RoofPublic on 2/FPublic on GroundOn the RoofOn the WallAlong the WallIn the cou50、rtyardsPublic&PrivateAddition on existing Jail JAIL RENOVATION STRATEGY-THE WALLBurying the Wall-Bringing landscape to the edge of the Wall-Continuation of the landscape on top of the Roof of the Jail-Experiencing the Wall by bringing people on the top of the Wall-Revealing courtyards from the top1K51、M Park along the Wall-Creating 1Km lanscape along the WallJAIL RENOVATION STRATEGY-THE WALLJAIL RENOVATION STRATEGY-THE PUBLIC AND PRIVATEPUBLIC on ROOFPUBLIC on 2/FPUBLIC on 1/F-The roof becomes the public floor,event courtyards are viewed from above-Vertical circulation becomes the nodes bringing 52、circulation down from the roof level into the courtyards-Possibility of bring in the landscape onto the roof -2nd level becomes the public floor,public private relationship is emphasized in each cell unit-Main intervention bringing public onto the 2nd level,penentration of wall is the focus-1st floo53、r is the public floor,penetration and connection to courtyards are focus-Public programs are arranged around the cutUPPublic circulation Public program/Event SpaceUPJAIL RENOVATION STRATEGY-PUBLIC LEVEL ON THE ROOFPublic on Roof-Connected to LandscapePrivate on 1/FVertical circulation programmed Eve54、nt CourtyardJAIL RENOVATION STRATEGY-PUBLIC LEVEL ON 2/FUP2F Public Level Plan2F2F2FExisting circulation UPUPUPCustomized design shopsPublic circulation Storefront window of design galleryDesign galleryArtist studioPrivate backyardfor ArtistMain intervention for publicPublic circulation Public progr55、am/Event SpaceCustomized art pathPublic LIbraryCovered ArtwalkPrivate StudioPublic Cut on 1/FPrivate Studio on 1/FJAIL RENOVATION STRATEGY-PUBLIC LEVEL ON 1/FJAIL RENOVATION STRATEGY-ADDITION ON ROOFJAIL RENOVATION STRATEGY-ADDITION ON ROOFJAIL RENOVATION STRATEGY-ADDITION ON THE WALL AND COURTYARDS56、JAIL RENOVATION STRATEGY-ADDITION ON THE WALL AND COURTYARDSJAIL RENOVATION STRATEGY-ADDITION ON THE WALL AND COURTYARDSJAIL RENOVATION STRATEGY-ADDITION ON THE WALL AND COURTYARDSJAIL RENOVATION STRATEGY-ADDITION ALONG THE WALL AND IN COURTYARDSJAIL RENOVATION STRATEGY-ADDITION ALONG THE WALL AND I57、N COURTYARDSJAIL RENOVATION STRATEGY-ADDITION ALONG THE WALL AND IN COURTYARDSJAIL RENOVATION STRATEGY-CUT ON THE GROUND LANDSCAPE DESIGN PROCESS 景观设计过程-三所建筑功能与形式单一,强有力的围合将空间功能绝对化;-围合带来的中心空地压迫感强烈-基地内部连接系统为打破强力围合提供可能-同时提供可穿越、可共享的公共空间。艺术空间艺术空间公共空间 LANDSCAPE CONCEPT SKETCHES 景观概念草图一层连通 保留二层连廊两层连通 保留二层连58、廊LANDSCAPE RESTORATION(Soil and water conservation/Shade/Accessibility/Sculptural landscape)森林景观生态恢复(土壤和水的保护/阴天/无障碍/雕塑景观)Renovation:-Main building,dog training Program:-Public park-Sculptural landscape-Art installation-Art galleries-Art display wallTarget group:-Public-TouristsNew developmentProgram59、:-Housing-R&D incubators-Reserach lab/workshopTarget group:-Professors/students from CUHK longgang-Researchers/Scholars Rehabilation:-Jail-LandscapeProgram:-Artist residence-Fabrication cells/workshops-Artist studios/galleriesTarget group:-Start-up Artists-Small design frmsPartial demolition&New add60、ition:-JailProgram:XXNew developmentProgram:-SOHO/Hotel-Large scale workshop-Exhibition-Commercial Target groups:-Established Artists-HIgh end design frms-Entrepreneur-Public Further renovation-JailProgram:XXArt Village 1.0Art Village 1.5Art Village 1.5+Art Village 2.0GovernmentDeveloperSansuo Phasi61、ng Development Yr 1Yr 2Yr 3Yr 4Start Zone Start Zone Redevelopment$Stone River/Jon PiaseckiLandscape Artist:Jon PiaseckiLocation:New York-Soil and water conservation-Shade-AccessibilityRenovation:-Main building,dog training Program:-Public park-Sculptural landscape-Art installation-Art galleries-Art62、 display wallTarget group:-Public-TouristsNew developmentProgram:-Housing-R&D incubators-Reserach lab/workshopTarget group:-Professors/students from CUHK longgang-Researchers/Scholars Rehabilation:-Jail-LandscapeProgram:-Artist residence-Fabrication cells/workshops-Artist studios/galleriesTarget gro63、up:-Start-up Artists-Small design frmsPartial demolition&New addition:-JailProgram:XXNew developmentProgram:-SOHO/Hotel-Large scale workshop-Exhibition-Commercial Target groups:-Established Artists-HIgh end design frms-Entrepreneur-Public Further renovation-JailProgram:XXArt Village 1.0Art Village 164、.5Art Village 1.5+Art Village 2.0GovernmentDeveloperSansuo Phasing Development Yr 1Yr 2Yr 3Yr 4Start Zone Start Zone Redevelopment$axiom+simulation 13by mark dorfA visual investigation of how humans use artistic,scientific and digital realism to explore their surroundings.-Sculptural landscape-Shade65、LANDSCAPE RESTORATION(Soil and water conservation/Shade/Accessibility/Sculptural landscape)森林景观生态恢复(土壤和水的保护/阴天/无障碍/雕塑景观)Renovation:-Main building,dog training Program:-Public park-Sculptural landscape-Art installation-Art galleries-Art display wallTarget group:-Public-TouristsNew developmentProgram:66、-Housing-R&D incubators-Reserach lab/workshopTarget group:-Professors/students from CUHK longgang-Researchers/Scholars Rehabilation:-Jail-LandscapeProgram:-Artist residence-Fabrication cells/workshops-Artist studios/galleriesTarget group:-Start-up Artists-Small design frmsPartial demolition&New addi67、tion:-JailProgram:XXNew developmentProgram:-SOHO/Hotel-Large scale workshop-Exhibition-Commercial Target groups:-Established Artists-HIgh end design frms-Entrepreneur-Public Further renovation-JailProgram:XXArt Village 1.0Art Village 1.5Art Village 1.5+Art Village 2.0GovernmentDeveloperSansuo Phasin68、g Development Yr 1Yr 2Yr 3Yr 4Start Zone Start Zone Redevelopment$Alexandra Arch&Forest Walk Architect:LOOK Architects Pte LtdLocation:Alexandra Road&Telok Blangah Hill Park,Singapore-Accessibility-ShadeLANDSCAPE RESTORATION(Soil and water conservation/Shade/Accessibility/Sculptural landscape)森林景观生态69、恢复(土壤和水的保护/阴天/无障碍/雕塑景观)Renovation:-Main building,dog training Program:-Public park-Sculptural landscape-Art installation-Art galleries-Art display wallTarget group:-Public-TouristsNew developmentProgram:-Housing-R&D incubators-Reserach lab/workshopTarget group:-Professors/students from CUHK longgang70、-Researchers/Scholars Rehabilation:-Jail-LandscapeProgram:-Artist residence-Fabrication cells/workshops-Artist studios/galleriesTarget group:-Start-up Artists-Small design frmsPartial demolition&New addition:-JailProgram:XXNew developmentProgram:-SOHO/Hotel-Large scale workshop-Exhibition-Commercial71、 Target groups:-Established Artists-HIgh end design frms-Entrepreneur-Public Further renovation-JailProgram:XXArt Village 1.0Art Village 1.5Art Village 1.5+Art Village 2.0GovernmentDeveloperSansuo Phasing Development Yr 1Yr 2Yr 3Yr 4Start Zone Start Zone Redevelopment$LANDSCAPE RESTORATION(Soil and water conservation/Shade/Accessibility/Sculptural landscape)森林景观生态恢复(土壤和水的保护/阴天/无障碍/雕塑景观)INFLATABLE BUILDINGCOVER DEVICESTART ZONE STRATEGY -PUBLIC EVENTS 前区策略-公众活动GALLERYSHOW ROOMSTART ZONE STRATEGY -PUBLIC EVENTS 前区策略-公众活动
会员尊享权益 会员尊享权益 会员尊享权益
500万份文档
500万份文档 免费下载
10万资源包
10万资源包 一键下载
4万份资料
4万份资料 打包下载
24小时客服
24小时客服 会员专属
开通 VIP
升级会员
  • 周热门排行

  • 月热门排行

  • 季热门排行

  1. 聊城市茌平区城市给水工程专项规划方案(2022-2035年)(148页).pdf
  2. 康普大楼综合布线施工方案【163页】.doc
  3. 住宅楼工程高处坠落物体打击等安全事故应急救援预案41页.doc
  4. 2020大运河滨水公共空间概念规划设计方案(266页).pdf
  5. 中央商务区综合建筑幕墙工程专项施工方案(215页).docx
  6. 中建八局33住宅楼、车库、配套及非标准层模板施工方案(106页).docx
  7. 丽水市水旅融合规划方案(2021-2025年)(186页).pdf
  8. 东莞市谢岗镇污水管网修复工程技术方案(61页).docx
  9. 2017-2035年山东省聊城市水安全保障总体规划文本说明书(86页).DOC
  10. 某项目管理公司工程项目管理实施方案(138页).doc
  11. 2019文旅融合发展报告.pdf
  12. 无锡运河传奇住宅项目策略及传播方案.pdf(159页)
  13. 研发楼、职工宿舍、食堂工程建筑施工安全事故应急救援预案方案【59页】.doc
  14. 大唐华府项目工程住宅楼一般质量缺陷修补方案【13页】.doc
  15. 全域旅游规划实施系统化措施(20页).ppt
  16. 福州酒店机电安装施工方案(161页).doc
  17. 中建三局施工企业项目管理标准化手册200页.doc
  18. 外墙无机保温砂浆施工方案(23页).doc
  19. 2020年浙江省大运河核心监控区国土空间管控通则(征求意见稿).pdf(53页)
  20. 2021年浙江省大运河核心监控区国土空间管控通则.pdf(16页)
  21. 中侨大厦外墙真石漆施工方案(21页).doc
  22. 建筑工程总承包公司工程创优指导手册(233页).pdf
  1. 设备工程钢筋混凝土基础施工方案(27页).docx
  2. 聊城市茌平区城市给水工程专项规划方案(2022-2035年)(148页).pdf
  3. 中国建筑公司甲级写字楼、公寓楼、室外街外装工程幕墙施工组织设计方案(353页).doc
  4. 康普大楼综合布线施工方案【163页】.doc
  5. 2023西路3个老旧小区改造项目可行性研究报告(199页).pdf
  6. 隧道工程施工安全风险控制技术培训课件.ppt
  7. 中央商务区综合建筑幕墙工程专项施工方案(215页).docx
  8. 中建八局33住宅楼、车库、配套及非标准层模板施工方案(106页).docx
  9. 施工现场常见隐患培训课件(46页).ppt
  10. 洋房、商业工程淋水试验专项施工方案(15页).doc
  11. 兰新铁路工程施工测量技术方案(22页).doc
  12. 慈溪市西部污水管线工程管道闭水试验施工方案(15页).doc
  13. 外立面改造装饰工程施工组织设计方案(177页).doc
  14. 丽水市水旅融合规划方案(2021-2025年)(186页).pdf
  15. 骆马湖水环境治理与水生态修复项目可行性研究报告(117页).pdf
  16. 公路工程工地试验室试验检测方案(33页).doc
  17. 南水北调工程渠道试验检测方案(56页).doc
  18. 东莞市谢岗镇污水管网修复工程技术方案(61页).docx
  19. 网络机房工程施工组织设计方案(132页).doc
  20. 2017-2035年山东省聊城市水安全保障总体规划文本说明书(86页).DOC
  21. 中建三局施工企业项目管理标准化手册200页.doc
  22. 某项目管理公司工程项目管理实施方案(138页).doc
  1. 设备工程钢筋混凝土基础施工方案(27页).docx
  2. 2024质量技术交底范本汇编(679页).pdf
  3. 2024长隆北加油站建设项目可行性研究报告(145页).pdf
  4. 客专铁路建设声屏障安装工程施工技术交底书.doc
  5. 48MW风电项目工程风机设备吊装专项施工方案86页.doc
  6. 2023小米智慧产业基地项目办公区精装修工程施工组织设计方案(198页).docx
  7. 建筑工程施工质量验收培训课件(38页).pptx
  8. 铁路声屏障工程路基非金属声屏障搭设操作平台单元板安装施工方案27页.docx
  9. 聊城市茌平区城市给水工程专项规划方案(2022-2035年)(148页).pdf
  10. 2023古镇旅游景区基础设施配套工程可行性研究报告(184页).pdf
  11. 中国建筑公司甲级写字楼、公寓楼、室外街外装工程幕墙施工组织设计方案(353页).doc
  12. 骆马湖水环境治理与水生态修复项目可行性研究报告(117页).pdf
  13. 南风花园二期开口工程施工组织设计方案(23页).doc
  14. 康普大楼综合布线施工方案【163页】.doc
  15. 网络机房工程施工组织设计方案(132页).doc
  16. 2017-2035年山东省聊城市水安全保障总体规划文本说明书(86页).DOC
  17. 中建三局施工企业项目管理标准化手册200页.doc
  18. 阳泽河水库清淤工程建设项目可行性研究报告47页.doc
  19. 襄樊电厂二期主厂房施工方案【202页】.doc
  20. 煤矿与建设机械装备生产制造基地项目锻压、下料厂房、热处理厂房、返修及涂装厂房吊车梁、屋架等预制构件制作及吊装工程施工方案【128页】.doc
  21. 房地产开发全流程培训.ppt
  22. 某项目管理公司工程项目管理实施方案(138页).doc